Informal risk management practices for cost overruns in Malaysian public linear projects / Marina Musa
The Malaysian construction industry is associated with a high degree of risk due to the nature of its business activities, process, environment and organisation. However, systematic risk management is not practiced in most public construction projects in Malaysia. This situation leads to project fai...
Main Author: | Musa, Marina |
---|---|
Format: | Book Section |
Language: | English |
Published: |
Institute of Graduate Studies, UiTM
2015
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/19468/ http://ir.uitm.edu.my/id/eprint/19468/1/ABS_MARINA%20MUSA%20TDRA%20VOL%208%20IGS%2015.pdf |
Similar Items
-
A voluntary risk information disclosure: a study of Malaysian Public Listed Companies / Rina Fadhilah Ismail, Emmarelda Maswesi Ahmad and Nor Syafinaz Shaffee
by: Ismail, Rina Fadhilah, et al.
Published: (2017) -
Quantifying Costs of Drought Risk in Ethiopia : A Technical Note
by: Drechsler, Mareile, et al.
Published: (2020) -
Reducing risk in defence projects some practical pactical pointers
by: HINGE
Published: (1994) -
Project risk management an essential tool for managing and controlling projects
Published: (2004) -
An exploration of cost overrun in building construction projects
by: Tan, Chin Keng, et al.
Published: (2018)