A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd Shukor

The Malaysian Construction Industry Master Plan (CIMP 2006-2015) identified the innovative approaches of Industrialised Building Systems (IBS) and its supply chains as having important roles in improving productivity in construction processes. Supply chains in IBS involve relationships between many...

Full description

Bibliographic Details
Main Author: Abd Shukor, Ani Saifuza
Format: Book Section
Language:English
Published: Institute of Graduate Studies, UiTM 2016
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/19390/
http://ir.uitm.edu.my/id/eprint/19390/1/ABS_ANI%20SAIFUZA%20ABD%20SHUKOR%20TDRA%20VOL%209%20IGS%2016.pdf
id uitm-19390
recordtype eprints
spelling uitm-193902018-06-11T06:13:01Z http://ir.uitm.edu.my/id/eprint/19390/ A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd Shukor Abd Shukor, Ani Saifuza Malaysia The Malaysian Construction Industry Master Plan (CIMP 2006-2015) identified the innovative approaches of Industrialised Building Systems (IBS) and its supply chains as having important roles in improving productivity in construction processes. Supply chains in IBS involve relationships between many organisations and processes, with the evolution of specialised roles and embedded relationships. The procurement method is utilised as a mediator tool and as the means of controlling integration between players. A good supply chain integration practice leads to good integration among players. Although efforts exist to enhance IBS practice in Malaysia, establishing integration between IBS players is still a major hindrance. A framework for improving supply chain integration is needed. The research problem investigated is lack of supply chain integration and togetherness in IBS project delivery in Malaysia based on four objectives: (1) to investigate the SCM understanding and implementation in IBS projects; (2) to determine the challenges at each tier between players in order to facilitate supply chain integration among the players; (3) to identify means and dimension factors influencing successful integration at each tier between players; and (4) to develop a framework to enhance supply chain integration for successful IBS projects… Institute of Graduate Studies, UiTM 2016 Book Section PeerReviewed text en http://ir.uitm.edu.my/id/eprint/19390/1/ABS_ANI%20SAIFUZA%20ABD%20SHUKOR%20TDRA%20VOL%209%20IGS%2016.pdf Abd Shukor, Ani Saifuza (2016) A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd Shukor. In: The Doctoral Research Abstracts. IGS Biannual Publication, 9 (9). Institute of Graduate Studies, UiTM, Shah Alam.
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
topic Malaysia
spellingShingle Malaysia
Abd Shukor, Ani Saifuza
A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd Shukor
description The Malaysian Construction Industry Master Plan (CIMP 2006-2015) identified the innovative approaches of Industrialised Building Systems (IBS) and its supply chains as having important roles in improving productivity in construction processes. Supply chains in IBS involve relationships between many organisations and processes, with the evolution of specialised roles and embedded relationships. The procurement method is utilised as a mediator tool and as the means of controlling integration between players. A good supply chain integration practice leads to good integration among players. Although efforts exist to enhance IBS practice in Malaysia, establishing integration between IBS players is still a major hindrance. A framework for improving supply chain integration is needed. The research problem investigated is lack of supply chain integration and togetherness in IBS project delivery in Malaysia based on four objectives: (1) to investigate the SCM understanding and implementation in IBS projects; (2) to determine the challenges at each tier between players in order to facilitate supply chain integration among the players; (3) to identify means and dimension factors influencing successful integration at each tier between players; and (4) to develop a framework to enhance supply chain integration for successful IBS projects…
format Book Section
author Abd Shukor, Ani Saifuza
author_facet Abd Shukor, Ani Saifuza
author_sort Abd Shukor, Ani Saifuza
title A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd Shukor
title_short A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd Shukor
title_full A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd Shukor
title_fullStr A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd Shukor
title_full_unstemmed A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd Shukor
title_sort framework on improving integration of supply chain in industrialised building system (ibs) using design & build procurement in malaysia / ani saifuza abd shukor
publisher Institute of Graduate Studies, UiTM
publishDate 2016
url http://ir.uitm.edu.my/id/eprint/19390/
http://ir.uitm.edu.my/id/eprint/19390/1/ABS_ANI%20SAIFUZA%20ABD%20SHUKOR%20TDRA%20VOL%209%20IGS%2016.pdf
first_indexed 2023-09-18T23:02:28Z
last_indexed 2023-09-18T23:02:28Z
_version_ 1777418264312283136