The performance measures of supply chain management for infrastructure project / Mohamad Razali Abd Wahab

The contribution of infrastructure to the development of country mainly Malaysia cannot be refused and this encourages the government to provide an established infrastructure facility. However, the problem facing by most of infrastructure project in term of management aspects such as management c...

Full description

Bibliographic Details
Main Author: Abd Wahab, Mohamad Razali
Format: Thesis
Language:English
Published: 2016
Online Access:http://ir.uitm.edu.my/id/eprint/18172/
http://ir.uitm.edu.my/id/eprint/18172/2/TM_MOHAMAD%20RAZALI%20ABD%20WAHAB%20AP%2016_5.pdf
id uitm-18172
recordtype eprints
spelling uitm-181722018-10-11T03:26:28Z http://ir.uitm.edu.my/id/eprint/18172/ The performance measures of supply chain management for infrastructure project / Mohamad Razali Abd Wahab Abd Wahab, Mohamad Razali The contribution of infrastructure to the development of country mainly Malaysia cannot be refused and this encourages the government to provide an established infrastructure facility. However, the problem facing by most of infrastructure project in term of management aspects such as management conflict and unsatisfied output becomes an obstacle to fulfill the government strategy. Thus a comprehensive management tool such as SCM is required as it is functioning as an overall management process to monitor and control all such logistic activities. Unfortunately, in reality, there was an issue to improve performance of supply chain due to lack of comprehensive view of SCM concept and lack of reliable measure to evaluate the process and operations of the supply chain. Thus, to overcome these issues, this research had designated an objective as follows 1) establish the most relevant indicator for performance measure of SCM through conceptual design 2) establish relevance indicators for performance measurement of supply chain through the perception of key players in infrastructure project 3) generate performance measurement framework of SCM in infrastructure project. The first approach of this research through conceptual design which involved literature review and expertise justification had identified six (6) performance indicators that were information dissemination, management, leadership, relationship development, customer management, activity sequences and green supply chain. This performance indicator had been used as the main reference to create the questionnaire. A total of 1000 survey form that consists of 50 questions had been sent randomly to key players of the Malaysian infrastructure project, namely implementer, client, consultant, and contractor/supplier. After 8 month period, about 225 forms had been received. The statistical analysis that's been used to form, verify and test the reliability of this questionnaire had identified five (5) performance indicators that were information dissemination, management leadership, relationship development, customer management and activities sequences. Besides that, this research had applied performance measurement framework of supply chain based on modification of SCOR model with performance measurement concept as a main reference. Hence, this framework that generated by 39 base measures at Level 2 (process category), clustered into 11 derived measures at Level 1 (process type) to form 5 performance indicator at main criteria could be used to evaluate, improve and control the performance of supply chain and as a reference for the key players to develop detailed guidelines that suit with the organization field or environment. 2016 Thesis NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/18172/2/TM_MOHAMAD%20RAZALI%20ABD%20WAHAB%20AP%2016_5.pdf Abd Wahab, Mohamad Razali (2016) The performance measures of supply chain management for infrastructure project / Mohamad Razali Abd Wahab. Masters thesis, Universiti Teknologi MARA.
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
description The contribution of infrastructure to the development of country mainly Malaysia cannot be refused and this encourages the government to provide an established infrastructure facility. However, the problem facing by most of infrastructure project in term of management aspects such as management conflict and unsatisfied output becomes an obstacle to fulfill the government strategy. Thus a comprehensive management tool such as SCM is required as it is functioning as an overall management process to monitor and control all such logistic activities. Unfortunately, in reality, there was an issue to improve performance of supply chain due to lack of comprehensive view of SCM concept and lack of reliable measure to evaluate the process and operations of the supply chain. Thus, to overcome these issues, this research had designated an objective as follows 1) establish the most relevant indicator for performance measure of SCM through conceptual design 2) establish relevance indicators for performance measurement of supply chain through the perception of key players in infrastructure project 3) generate performance measurement framework of SCM in infrastructure project. The first approach of this research through conceptual design which involved literature review and expertise justification had identified six (6) performance indicators that were information dissemination, management, leadership, relationship development, customer management, activity sequences and green supply chain. This performance indicator had been used as the main reference to create the questionnaire. A total of 1000 survey form that consists of 50 questions had been sent randomly to key players of the Malaysian infrastructure project, namely implementer, client, consultant, and contractor/supplier. After 8 month period, about 225 forms had been received. The statistical analysis that's been used to form, verify and test the reliability of this questionnaire had identified five (5) performance indicators that were information dissemination, management leadership, relationship development, customer management and activities sequences. Besides that, this research had applied performance measurement framework of supply chain based on modification of SCOR model with performance measurement concept as a main reference. Hence, this framework that generated by 39 base measures at Level 2 (process category), clustered into 11 derived measures at Level 1 (process type) to form 5 performance indicator at main criteria could be used to evaluate, improve and control the performance of supply chain and as a reference for the key players to develop detailed guidelines that suit with the organization field or environment.
format Thesis
author Abd Wahab, Mohamad Razali
spellingShingle Abd Wahab, Mohamad Razali
The performance measures of supply chain management for infrastructure project / Mohamad Razali Abd Wahab
author_facet Abd Wahab, Mohamad Razali
author_sort Abd Wahab, Mohamad Razali
title The performance measures of supply chain management for infrastructure project / Mohamad Razali Abd Wahab
title_short The performance measures of supply chain management for infrastructure project / Mohamad Razali Abd Wahab
title_full The performance measures of supply chain management for infrastructure project / Mohamad Razali Abd Wahab
title_fullStr The performance measures of supply chain management for infrastructure project / Mohamad Razali Abd Wahab
title_full_unstemmed The performance measures of supply chain management for infrastructure project / Mohamad Razali Abd Wahab
title_sort performance measures of supply chain management for infrastructure project / mohamad razali abd wahab
publishDate 2016
url http://ir.uitm.edu.my/id/eprint/18172/
http://ir.uitm.edu.my/id/eprint/18172/2/TM_MOHAMAD%20RAZALI%20ABD%20WAHAB%20AP%2016_5.pdf
first_indexed 2023-09-18T22:59:55Z
last_indexed 2023-09-18T22:59:55Z
_version_ 1777418104719015936