A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd. Shukor

The Malaysian Construction Industry Master Plan (CIMP 2006-2015) identified the innovative approaches of Industrialised Building Systems (IBS) and its supply chains as having important roles in improving productivity in construction processes. Supply chains in IBS involve relationships between many...

Full description

Bibliographic Details
Main Author: Abd. Shukor, Ani Saifuza
Format: Thesis
Language:English
Published: 2015
Online Access:http://ir.uitm.edu.my/id/eprint/17665/
http://ir.uitm.edu.my/id/eprint/17665/2/TP_ANI%20SAIFUZA%20ABD.%20SHUKOR%20AP%2015_5.pdf
id uitm-17665
recordtype eprints
spelling uitm-176652018-09-26T08:20:19Z http://ir.uitm.edu.my/id/eprint/17665/ A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd. Shukor Abd. Shukor, Ani Saifuza The Malaysian Construction Industry Master Plan (CIMP 2006-2015) identified the innovative approaches of Industrialised Building Systems (IBS) and its supply chains as having important roles in improving productivity in construction processes. Supply chains in IBS involve relationships between many organisations and processes, with the evolution of specialised roles and embedded relationships. The procurement method is utilised as a mediator tool and as the means of controlling integration between players. A good supply chain integration practice leads to good integration among players. Although efforts exist to enhance IBS practice in Malaysia, establishing integration between IBS players is still a major hindrance. A framework for improving supply chain integration is needed. The research problem investigated is lack of supply chain integration and togetherness in IBS project delivery in Malaysia based on four objectives: (1) to investigate the SCM understanding and implementation in IBS projects; (2) to determine the challenges at each tier between players in order to facilitate supply chain integration among the players; (3) to identify means and dimension factors influencing successful integration at each tier between players; and (4) to develop a framework to enhance supply chain integration for successful IBS projects. This study adopted a multiple methods approach involving two stages: Stage 1, an exploratory stage using a mixed approach of quantitative (with 27 respondents) and qualitative methods (with 6 respondents); and Stage 2, a qualitative methods stage consisting of semi-structured interviews (with 35 respondents) and four (4) project observations. The study identified eight challenges: (1) lack of sufficient knowledge, understanding, and familiarity; (2) attitude and mentality; (3) financial matters; (4) work planning and arrangement; (5) supply chain flow and interaction; (6) guidelines and requirements; (7) risk and conflict liability, and (8) contractual and procurement matters, and means and dimension factors influencing successful integration were grouped into four categories: (1) human and behavioural means, (2) supply chain process and exchange flow, (3) supply chain structure and collaboration, and (4) work environment. The research outputs seek to facilitate and provide a framework as a term of reference for improving integration between supply chain players for the successful implementation of IBS project delivery. 2015 Thesis NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/17665/2/TP_ANI%20SAIFUZA%20ABD.%20SHUKOR%20AP%2015_5.pdf Abd. Shukor, Ani Saifuza (2015) A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd. Shukor. PhD thesis, Universiti Teknologi MARA.
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
description The Malaysian Construction Industry Master Plan (CIMP 2006-2015) identified the innovative approaches of Industrialised Building Systems (IBS) and its supply chains as having important roles in improving productivity in construction processes. Supply chains in IBS involve relationships between many organisations and processes, with the evolution of specialised roles and embedded relationships. The procurement method is utilised as a mediator tool and as the means of controlling integration between players. A good supply chain integration practice leads to good integration among players. Although efforts exist to enhance IBS practice in Malaysia, establishing integration between IBS players is still a major hindrance. A framework for improving supply chain integration is needed. The research problem investigated is lack of supply chain integration and togetherness in IBS project delivery in Malaysia based on four objectives: (1) to investigate the SCM understanding and implementation in IBS projects; (2) to determine the challenges at each tier between players in order to facilitate supply chain integration among the players; (3) to identify means and dimension factors influencing successful integration at each tier between players; and (4) to develop a framework to enhance supply chain integration for successful IBS projects. This study adopted a multiple methods approach involving two stages: Stage 1, an exploratory stage using a mixed approach of quantitative (with 27 respondents) and qualitative methods (with 6 respondents); and Stage 2, a qualitative methods stage consisting of semi-structured interviews (with 35 respondents) and four (4) project observations. The study identified eight challenges: (1) lack of sufficient knowledge, understanding, and familiarity; (2) attitude and mentality; (3) financial matters; (4) work planning and arrangement; (5) supply chain flow and interaction; (6) guidelines and requirements; (7) risk and conflict liability, and (8) contractual and procurement matters, and means and dimension factors influencing successful integration were grouped into four categories: (1) human and behavioural means, (2) supply chain process and exchange flow, (3) supply chain structure and collaboration, and (4) work environment. The research outputs seek to facilitate and provide a framework as a term of reference for improving integration between supply chain players for the successful implementation of IBS project delivery.
format Thesis
author Abd. Shukor, Ani Saifuza
spellingShingle Abd. Shukor, Ani Saifuza
A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd. Shukor
author_facet Abd. Shukor, Ani Saifuza
author_sort Abd. Shukor, Ani Saifuza
title A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd. Shukor
title_short A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd. Shukor
title_full A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd. Shukor
title_fullStr A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd. Shukor
title_full_unstemmed A framework on improving integration of supply chain in Industrialised Building System (IBS) using design & build procurement in Malaysia / Ani Saifuza Abd. Shukor
title_sort framework on improving integration of supply chain in industrialised building system (ibs) using design & build procurement in malaysia / ani saifuza abd. shukor
publishDate 2015
url http://ir.uitm.edu.my/id/eprint/17665/
http://ir.uitm.edu.my/id/eprint/17665/2/TP_ANI%20SAIFUZA%20ABD.%20SHUKOR%20AP%2015_5.pdf
first_indexed 2023-09-18T22:58:47Z
last_indexed 2023-09-18T22:58:47Z
_version_ 1777418033356079104