A study on the defect liability on low cost housing / Mohammad Azlin Hamat
According to a statement issued by the Ministry of Finance Malaysia, the period of defective liability is a period which the contractor must repair any defects identified by supervisors after completion of the work certified. All defect repair expenses shall be borne by the contractor and no additio...
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
Faculty of Architecture, Planning and Surveying
2013
|
Online Access: | http://ir.uitm.edu.my/id/eprint/16545/ http://ir.uitm.edu.my/id/eprint/16545/1/PPb_MOHAMMAD%20AZLIN%20HAMAT%20AP%2013_5.pdf |