A survey on communication method and tool among consultant and contractor in construction project / Mohamad Adib Abdul Talib

According to Micheal Hattersbeg (2007), communication is the role used for escort and how coordination in the collection activity or collection of social experts. As an interface, each individual in the collection will have acquired sufficient communication to reach a settlement and the idea sparked...

Full description

Bibliographic Details
Main Author: Abdul Talib, Mohamad Adib
Format: Student Project
Language:English
Published: Faculty of Architecture, Planning and Surveying 2013
Online Access:http://ir.uitm.edu.my/id/eprint/16527/
http://ir.uitm.edu.my/id/eprint/16527/2/PPb_MOHAMAD%20ADIB%20ABDUL%20TALIB%20AP%2013_5.pdf
id uitm-16527
recordtype eprints
spelling uitm-165272019-10-08T08:09:17Z http://ir.uitm.edu.my/id/eprint/16527/ A survey on communication method and tool among consultant and contractor in construction project / Mohamad Adib Abdul Talib Abdul Talib, Mohamad Adib According to Micheal Hattersbeg (2007), communication is the role used for escort and how coordination in the collection activity or collection of social experts. As an interface, each individual in the collection will have acquired sufficient communication to reach a settlement and the idea sparked something of a problem. This research is about A Survey on Communication Method and Tool among Consultant and Contractor in Construction Project. The aim of this study is to investigate the problem communication between consultant and contractor and the best solution method and tool can be applied on the construction site. Firstly objective to study of the communication process at the construction site. Secondly objective review the methods and tool of communication carried out the construction site. Lastly identify the major problems of communication failure between the consultant to the contractor and otherwise. About 38 questionnaires was distributed to the two locations at the Setapak, Kuala Lumpur about project 70 units of 3 storey housing and Ampang, Kuala Lumpur IB tower project 58 storey . From of the study it was found that there are differences in the methods and tools that prevail between the consultant and the contractor and the appearance of some problems such as poor pronunciation of the two sides is going on in the case study. With this in and that's hope this study will be extended through case studies and examine other that's Problems involve all parties in a construction project in more detail. Faculty of Architecture, Planning and Surveying 2013 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/16527/2/PPb_MOHAMAD%20ADIB%20ABDUL%20TALIB%20AP%2013_5.pdf Abdul Talib, Mohamad Adib (2013) A survey on communication method and tool among consultant and contractor in construction project / Mohamad Adib Abdul Talib. [Student Project] (Unpublished)
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
description According to Micheal Hattersbeg (2007), communication is the role used for escort and how coordination in the collection activity or collection of social experts. As an interface, each individual in the collection will have acquired sufficient communication to reach a settlement and the idea sparked something of a problem. This research is about A Survey on Communication Method and Tool among Consultant and Contractor in Construction Project. The aim of this study is to investigate the problem communication between consultant and contractor and the best solution method and tool can be applied on the construction site. Firstly objective to study of the communication process at the construction site. Secondly objective review the methods and tool of communication carried out the construction site. Lastly identify the major problems of communication failure between the consultant to the contractor and otherwise. About 38 questionnaires was distributed to the two locations at the Setapak, Kuala Lumpur about project 70 units of 3 storey housing and Ampang, Kuala Lumpur IB tower project 58 storey . From of the study it was found that there are differences in the methods and tools that prevail between the consultant and the contractor and the appearance of some problems such as poor pronunciation of the two sides is going on in the case study. With this in and that's hope this study will be extended through case studies and examine other that's Problems involve all parties in a construction project in more detail.
format Student Project
author Abdul Talib, Mohamad Adib
spellingShingle Abdul Talib, Mohamad Adib
A survey on communication method and tool among consultant and contractor in construction project / Mohamad Adib Abdul Talib
author_facet Abdul Talib, Mohamad Adib
author_sort Abdul Talib, Mohamad Adib
title A survey on communication method and tool among consultant and contractor in construction project / Mohamad Adib Abdul Talib
title_short A survey on communication method and tool among consultant and contractor in construction project / Mohamad Adib Abdul Talib
title_full A survey on communication method and tool among consultant and contractor in construction project / Mohamad Adib Abdul Talib
title_fullStr A survey on communication method and tool among consultant and contractor in construction project / Mohamad Adib Abdul Talib
title_full_unstemmed A survey on communication method and tool among consultant and contractor in construction project / Mohamad Adib Abdul Talib
title_sort survey on communication method and tool among consultant and contractor in construction project / mohamad adib abdul talib
publisher Faculty of Architecture, Planning and Surveying
publishDate 2013
url http://ir.uitm.edu.my/id/eprint/16527/
http://ir.uitm.edu.my/id/eprint/16527/2/PPb_MOHAMAD%20ADIB%20ABDUL%20TALIB%20AP%2013_5.pdf
first_indexed 2023-09-18T22:56:16Z
last_indexed 2023-09-18T22:56:16Z
_version_ 1777417874629984256