Defect study during defect liability period / Mohd Asrul Hassin

Malaysia is one the fastest growing developing nation in the region and the world. In order to remain at pace, the government had planned and budgeted billions of Ringgit to ensure the flow of projects in Malaysia. From the report and the problem statement in the newly completed project, government...

Full description

Bibliographic Details
Main Author: Hassin, Mohd Asrul
Format: Thesis
Language:English
Published: 2010
Subjects:
Online Access:http://ir.uitm.edu.my/id/eprint/15542/
http://ir.uitm.edu.my/id/eprint/15542/1/TD_MOHD%20ASRUL%20HASSIN%20AP%2010_5.pdf
id uitm-15542
recordtype eprints
spelling uitm-155422016-11-21T07:02:26Z http://ir.uitm.edu.my/id/eprint/15542/ Defect study during defect liability period / Mohd Asrul Hassin Hassin, Mohd Asrul Building failures, errors, defects, etc. Malaysia is one the fastest growing developing nation in the region and the world. In order to remain at pace, the government had planned and budgeted billions of Ringgit to ensure the flow of projects in Malaysia. From the report and the problem statement in the newly completed project, government made the modification in the practice the Defect Liability Period. Government extended from the normal Defect Liability Period 12 months to 24 months. The reason why government extended the Defect Liability Period because to give the opportunity to clients or building owner make the report on the defect occur in their building. A study was conducted to identify the types o f defect, categories o f defect and how critical o f defects occurred during Defect Liability Period. A total o f 50 questionnaires were distributed to contractor, consultant, developer and building owner. The study indicated that defects are due to faulty design, faulty construction, faulty material and faulty use. The 4 groups o f defects mentioned above are main causes o f defects. The most group critical o f defect is faulty use in questionnaire result. Conditionsurvey indicated the faulty construction is the higher critical o f defects occurred during Defect Liability Period. 2010 Thesis NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/15542/1/TD_MOHD%20ASRUL%20HASSIN%20AP%2010_5.pdf Hassin, Mohd Asrul (2010) Defect study during defect liability period / Mohd Asrul Hassin. Degree thesis, Universiti Teknologi MARA.
repository_type Digital Repository
institution_category Local University
institution Universiti Teknologi MARA
building UiTM Institutional Repository
collection Online Access
language English
topic Building failures, errors, defects, etc.
spellingShingle Building failures, errors, defects, etc.
Hassin, Mohd Asrul
Defect study during defect liability period / Mohd Asrul Hassin
description Malaysia is one the fastest growing developing nation in the region and the world. In order to remain at pace, the government had planned and budgeted billions of Ringgit to ensure the flow of projects in Malaysia. From the report and the problem statement in the newly completed project, government made the modification in the practice the Defect Liability Period. Government extended from the normal Defect Liability Period 12 months to 24 months. The reason why government extended the Defect Liability Period because to give the opportunity to clients or building owner make the report on the defect occur in their building. A study was conducted to identify the types o f defect, categories o f defect and how critical o f defects occurred during Defect Liability Period. A total o f 50 questionnaires were distributed to contractor, consultant, developer and building owner. The study indicated that defects are due to faulty design, faulty construction, faulty material and faulty use. The 4 groups o f defects mentioned above are main causes o f defects. The most group critical o f defect is faulty use in questionnaire result. Conditionsurvey indicated the faulty construction is the higher critical o f defects occurred during Defect Liability Period.
format Thesis
author Hassin, Mohd Asrul
author_facet Hassin, Mohd Asrul
author_sort Hassin, Mohd Asrul
title Defect study during defect liability period / Mohd Asrul Hassin
title_short Defect study during defect liability period / Mohd Asrul Hassin
title_full Defect study during defect liability period / Mohd Asrul Hassin
title_fullStr Defect study during defect liability period / Mohd Asrul Hassin
title_full_unstemmed Defect study during defect liability period / Mohd Asrul Hassin
title_sort defect study during defect liability period / mohd asrul hassin
publishDate 2010
url http://ir.uitm.edu.my/id/eprint/15542/
http://ir.uitm.edu.my/id/eprint/15542/1/TD_MOHD%20ASRUL%20HASSIN%20AP%2010_5.pdf
first_indexed 2023-09-18T22:54:05Z
last_indexed 2023-09-18T22:54:05Z
_version_ 1777417737448980480