Demand-Supply Gap Analysis

An essential part of the Pakistan Infrastructure Implementation Capacity Assessment (PIICA) was an assessment of available resources and the demand generated for these resources by the proposed infrastructure projects. A demand-supply gap analysis...

Full description

Bibliographic Details
Main Authors: Mir, Aized H., Abidi, Sohail, Durrani, Amer Z.
Format: Policy Note
Language:English
en_US
Published: World Bank, Washington, DC 2014
Subjects:
Online Access:http://documents.worldbank.org/curated/en/2007/11/9368475/demand-supply-gap-analysis
http://hdl.handle.net/10986/19546
id okr-10986-19546
recordtype oai_dc
spelling okr-10986-195462021-04-23T14:03:46Z Demand-Supply Gap Analysis Mir, Aized H. Abidi, Sohail Durrani, Amer Z. AGGREGATE DEMAND AIR AIRPORTS ASPHALT BITUMEN BRAIN DRAIN BRIDGE CARRIAGEWAY CBR CEMENT CEMENT PRODUCTION CIVIL ENGINEERING CIVIL ENGINEERS COMPACTION CONCRETE CONCRETE BRIDGES CONSTRUCTION COSTS CONSTRUCTION EQUIPMENT CONSTRUCTION INDUSTRIES CONSTRUCTION INDUSTRY CONSTRUCTION MACHINERY CONSTRUCTION MATERIALS CONSTRUCTION WORKERS CRANES CRUSHING CULVERTS DESCRIPTION DEVELOPERS DRAINAGE EARTHQUAKE RECONSTRUCTION EARTHWORK ELECTRICIANS EMBANKMENT EMPLOYMENT ENGINEER EQUATIONS EXCAVATION EXCAVATORS FACTORIES FORMWORK FRAMEWORK GENERATORS HAULAGE HEAVY CONSTRUCTION HEAVY EQUIPMENT HIGHWAY HIGHWAY AUTHORITY HIGHWAY PROJECT HIGHWAYS HOSPITALS HOUSES HOUSING HOUSING UNITS INDUSTRIAL SECTOR INFRASTRUCTURE PROJECTS INTERNATIONAL AIRPORT LABOR ORGANIZATION LABORERS LABOUR LAND ACQUISITION LEASING MANPOWER MANPOWER REQUIREMENTS MANPOWER UTILIZATION MECHANICAL SHOVELS METALLURGY MOTOR VEHICLE MOTOR VEHICLE REGISTRATION MOTORWAYS PAVEMENT PAVEMENTS PAVING PREFABRICATION PRODUCTIVITY PROVINCIAL ROADS RAIL RAIL LINK RAILWAYS REINFORCEMENT ROAD ROAD PROJECTS ROAD SECTOR ROADS ROADWAY ROADWAY CONSTRUCTION ROLLERS ROUTES SKILLED MANPOWER SKILLED WORKERS SOILS SPAN SPEED STATE HIGHWAY STEEL STRUCTURES TANDEM ROLLER TANKER TRUCKS TANKERS TRAININGS TRANSIT TRANSPORT TRANSPORT AUTHORITY TRANSPORTATION TRANSPORTATION OFFICIALS TRUCKS UNSKILLED LABOR UNSKILLED WORKERS VEHICLE VEHICLE REGISTRATION VEHICLES WORK FORCE An essential part of the Pakistan Infrastructure Implementation Capacity Assessment (PIICA) was an assessment of available resources and the demand generated for these resources by the proposed infrastructure projects. A demand-supply gap analysis for Human Resources (HR), major construction materials and equipment keeping in view the Medium Term Development Framework (MTDF) for up to 2010 has been reviewed to better understand the constraints faced by the industry. Shortage of manpower emerged as a significant theme when studying the implementation capacity of large infrastructure projects in Pakistan. Stakeholders (clients, consultants and contractors) have been unanimous in identifying the lack of suitably qualified people in their organizations as an impediment both to successful implementation as well as the quality of the products and services they deliver. The Perception Survey conducted for the purpose of this study revealed that 67 percent of stakeholders believed that HR posed a significant constraint to the implementation of large infrastructure projects in Pakistan (Gallup Perception Survey,(2006). It is thus important to quantify the HR gap within the construction industry, both in absolute numbers and skills deficiencies and the gaps in materials and machinery, given the enlarged infrastructure construction program planned during the next few years under the MTDF. Have the planners and policy makers catered for these pre-requisites in the MTDF? This is the question that the study addresses'. 2014-08-21T14:23:12Z 2014-08-21T14:23:12Z 2007-11 http://documents.worldbank.org/curated/en/2007/11/9368475/demand-supply-gap-analysis http://hdl.handle.net/10986/19546 English en_US CC BY 3.0 IGO http://creativecommons.org/licenses/by/3.0/igo/ World Bank, Washington, DC Economic & Sector Work :: Policy Note Economic & Sector Work South Asia Pakistan
repository_type Digital Repository
institution_category Foreign Institution
institution Digital Repositories
building World Bank Open Knowledge Repository
collection World Bank
language English
en_US
topic AGGREGATE DEMAND
AIR
AIRPORTS
ASPHALT
BITUMEN
BRAIN DRAIN
BRIDGE
CARRIAGEWAY
CBR
CEMENT
CEMENT PRODUCTION
CIVIL ENGINEERING
CIVIL ENGINEERS
COMPACTION
CONCRETE
CONCRETE BRIDGES
CONSTRUCTION COSTS
CONSTRUCTION EQUIPMENT
CONSTRUCTION INDUSTRIES
CONSTRUCTION INDUSTRY
CONSTRUCTION MACHINERY
CONSTRUCTION MATERIALS
CONSTRUCTION WORKERS
CRANES
CRUSHING
CULVERTS
DESCRIPTION
DEVELOPERS
DRAINAGE
EARTHQUAKE RECONSTRUCTION
EARTHWORK
ELECTRICIANS
EMBANKMENT
EMPLOYMENT
ENGINEER
EQUATIONS
EXCAVATION
EXCAVATORS
FACTORIES
FORMWORK
FRAMEWORK
GENERATORS
HAULAGE
HEAVY CONSTRUCTION
HEAVY EQUIPMENT
HIGHWAY
HIGHWAY AUTHORITY
HIGHWAY PROJECT
HIGHWAYS
HOSPITALS
HOUSES
HOUSING
HOUSING UNITS
INDUSTRIAL SECTOR
INFRASTRUCTURE PROJECTS
INTERNATIONAL AIRPORT
LABOR ORGANIZATION
LABORERS
LABOUR
LAND ACQUISITION
LEASING
MANPOWER
MANPOWER REQUIREMENTS
MANPOWER UTILIZATION
MECHANICAL SHOVELS
METALLURGY
MOTOR VEHICLE
MOTOR VEHICLE REGISTRATION
MOTORWAYS
PAVEMENT
PAVEMENTS
PAVING
PREFABRICATION
PRODUCTIVITY
PROVINCIAL ROADS
RAIL
RAIL LINK
RAILWAYS
REINFORCEMENT
ROAD
ROAD PROJECTS
ROAD SECTOR
ROADS
ROADWAY
ROADWAY CONSTRUCTION
ROLLERS
ROUTES
SKILLED MANPOWER
SKILLED WORKERS
SOILS
SPAN
SPEED
STATE HIGHWAY
STEEL
STRUCTURES
TANDEM ROLLER
TANKER TRUCKS
TANKERS
TRAININGS
TRANSIT
TRANSPORT
TRANSPORT AUTHORITY
TRANSPORTATION
TRANSPORTATION OFFICIALS
TRUCKS
UNSKILLED LABOR
UNSKILLED WORKERS
VEHICLE
VEHICLE REGISTRATION
VEHICLES
WORK FORCE
spellingShingle AGGREGATE DEMAND
AIR
AIRPORTS
ASPHALT
BITUMEN
BRAIN DRAIN
BRIDGE
CARRIAGEWAY
CBR
CEMENT
CEMENT PRODUCTION
CIVIL ENGINEERING
CIVIL ENGINEERS
COMPACTION
CONCRETE
CONCRETE BRIDGES
CONSTRUCTION COSTS
CONSTRUCTION EQUIPMENT
CONSTRUCTION INDUSTRIES
CONSTRUCTION INDUSTRY
CONSTRUCTION MACHINERY
CONSTRUCTION MATERIALS
CONSTRUCTION WORKERS
CRANES
CRUSHING
CULVERTS
DESCRIPTION
DEVELOPERS
DRAINAGE
EARTHQUAKE RECONSTRUCTION
EARTHWORK
ELECTRICIANS
EMBANKMENT
EMPLOYMENT
ENGINEER
EQUATIONS
EXCAVATION
EXCAVATORS
FACTORIES
FORMWORK
FRAMEWORK
GENERATORS
HAULAGE
HEAVY CONSTRUCTION
HEAVY EQUIPMENT
HIGHWAY
HIGHWAY AUTHORITY
HIGHWAY PROJECT
HIGHWAYS
HOSPITALS
HOUSES
HOUSING
HOUSING UNITS
INDUSTRIAL SECTOR
INFRASTRUCTURE PROJECTS
INTERNATIONAL AIRPORT
LABOR ORGANIZATION
LABORERS
LABOUR
LAND ACQUISITION
LEASING
MANPOWER
MANPOWER REQUIREMENTS
MANPOWER UTILIZATION
MECHANICAL SHOVELS
METALLURGY
MOTOR VEHICLE
MOTOR VEHICLE REGISTRATION
MOTORWAYS
PAVEMENT
PAVEMENTS
PAVING
PREFABRICATION
PRODUCTIVITY
PROVINCIAL ROADS
RAIL
RAIL LINK
RAILWAYS
REINFORCEMENT
ROAD
ROAD PROJECTS
ROAD SECTOR
ROADS
ROADWAY
ROADWAY CONSTRUCTION
ROLLERS
ROUTES
SKILLED MANPOWER
SKILLED WORKERS
SOILS
SPAN
SPEED
STATE HIGHWAY
STEEL
STRUCTURES
TANDEM ROLLER
TANKER TRUCKS
TANKERS
TRAININGS
TRANSIT
TRANSPORT
TRANSPORT AUTHORITY
TRANSPORTATION
TRANSPORTATION OFFICIALS
TRUCKS
UNSKILLED LABOR
UNSKILLED WORKERS
VEHICLE
VEHICLE REGISTRATION
VEHICLES
WORK FORCE
Mir, Aized H.
Abidi, Sohail
Durrani, Amer Z.
Demand-Supply Gap Analysis
geographic_facet South Asia
Pakistan
description An essential part of the Pakistan Infrastructure Implementation Capacity Assessment (PIICA) was an assessment of available resources and the demand generated for these resources by the proposed infrastructure projects. A demand-supply gap analysis for Human Resources (HR), major construction materials and equipment keeping in view the Medium Term Development Framework (MTDF) for up to 2010 has been reviewed to better understand the constraints faced by the industry. Shortage of manpower emerged as a significant theme when studying the implementation capacity of large infrastructure projects in Pakistan. Stakeholders (clients, consultants and contractors) have been unanimous in identifying the lack of suitably qualified people in their organizations as an impediment both to successful implementation as well as the quality of the products and services they deliver. The Perception Survey conducted for the purpose of this study revealed that 67 percent of stakeholders believed that HR posed a significant constraint to the implementation of large infrastructure projects in Pakistan (Gallup Perception Survey,(2006). It is thus important to quantify the HR gap within the construction industry, both in absolute numbers and skills deficiencies and the gaps in materials and machinery, given the enlarged infrastructure construction program planned during the next few years under the MTDF. Have the planners and policy makers catered for these pre-requisites in the MTDF? This is the question that the study addresses'.
format Economic & Sector Work :: Policy Note
author Mir, Aized H.
Abidi, Sohail
Durrani, Amer Z.
author_facet Mir, Aized H.
Abidi, Sohail
Durrani, Amer Z.
author_sort Mir, Aized H.
title Demand-Supply Gap Analysis
title_short Demand-Supply Gap Analysis
title_full Demand-Supply Gap Analysis
title_fullStr Demand-Supply Gap Analysis
title_full_unstemmed Demand-Supply Gap Analysis
title_sort demand-supply gap analysis
publisher World Bank, Washington, DC
publishDate 2014
url http://documents.worldbank.org/curated/en/2007/11/9368475/demand-supply-gap-analysis
http://hdl.handle.net/10986/19546
_version_ 1764441367429251072