Focus Group Discussion

The Pakistan Infrastructure Implementation Capacity Assessment (PIICA) study was initiated in response to a specific request from the Government of Pakistan (GoP) to study the capacity of the local construction industry (client institutions,...

Full description

Bibliographic Details
Main Authors: Mir, Aized H., Malik, Ermeena, Durrani, Amer Z.
Format: Policy Note
Language:English
en_US
Published: World Bank, Washington, DC 2014
Subjects:
ADB
BID
ICT
PC
TAX
Online Access:http://documents.worldbank.org/curated/en/2007/11/9367845/focus-group-discussion
http://hdl.handle.net/10986/19544
id okr-10986-19544
recordtype oai_dc
repository_type Digital Repository
institution_category Foreign Institution
institution Digital Repositories
building World Bank Open Knowledge Repository
collection World Bank
language English
en_US
topic ACCOUNT
ACCOUNTABILITY
ACCOUNTING
ACQUISITION
ADB
ADVERTISEMENTS
AUDITORS
AUDITS
AUTOMATION
AUTONOMY
AVAILABILITY OF CREDIT
BANK GUARANTEE
BANK GUARANTEES
BANKING INDUSTRY
BANKING SECTOR
BID
BIDS
BILLS
BOND
BONDS
BUDGETING
BUSINESS ADMINISTRATION
BUSINESS DEVELOPMENT
BUSINESS ENVIRONMENT
BUSINESS ENVIRONMENTS
BUSINESS PROCESSES
CAPABILITIES
CAPABILITY
CAPACITY BUILDING
CAPACITY CONSTRAINTS
CASH FLOW
CERTIFICATE
CHECKS
COLLATERAL
COMMERCIAL BANK
COMMERCIAL BANKS
COMMUNICATIONS TECHNOLOGY
COMPETITIVE BIDDING
COMPETITIVE PRICE
CONTRACTORS
CONTROL SYSTEM
CORPORATE TAX RATE
COST ESTIMATES
CREDIT LINES
CURRENCY
DEPOSIT
DEVELOPMENT BANK
DEVELOPMENT FINANCE
DISBURSEMENT
DISBURSEMENTS
DISPUTE RESOLUTION
DOMAIN
DOUBLE TAXATION
ECONOMIC CONDITIONS
ELECTRICITY
EQUIPMENT
ESCROW
EXCHANGE COMMISSION
EXPENDITURE
EXPENDITURES
FINANCES
FINANCIAL INSTITUTIONS
FINANCIAL STRENGTH
FINANCIAL SUPPORT
FORM OF COLLATERAL
FUTURE CONTRACTS
HOUSING
HUMAN RESOURCE
HUMAN RESOURCE DEVELOPMENT
HUMAN RESOURCES
ICT
IMAGE
IMPLEMENTING AGENCIES
INCOME TAX
INFLATION
INFORMATION SYSTEMS
INFRASTRUCTURE DEVELOPMENT
INFRASTRUCTURE MANAGEMENT
INSTITUTIONAL SUPPORT
INSURANCE
INTERNAL SYSTEM
INTERNATIONAL BANK
INTERNATIONAL BEST PRACTICES
INTERNATIONAL CONSULTANTS
INTERNATIONAL DEVELOPMENT
INTERNATIONAL FINANCE
INTERNATIONAL MARKET
INTERNATIONAL MARKETS
INTERNATIONAL STANDARDS
INVESTING
ISLAMIC BANK
JOINT VENTURES
LACK OF TRANSPARENCY
LENDER
LENDING PORTFOLIO
LETTER OF CREDIT
LEVEL PLAYING FIELD
LEVIES
LIABILITY
LOCAL CAPACITY
MANDATES
MATERIAL
MIDDLE EAST
MONITORING MECHANISM
NET PROFIT
NEW ENTRANTS
NEW TECHNOLOGY
OVERHEAD
PC
PRIVATE PARTNERSHIPS
PRIVATE SECTOR
PRIVATE SECTOR FIRMS
PROCUREMENT
PROCUREMENTS
PRODUCTIVITY
PROJECT MANAGEMENT
PRUDENTIAL REGULATIONS
PUBLIC DISCLOSURE
PUBLIC SPENDING
QUALITY ASSURANCE
QUALITY OF EDUCATION
QUALITY OF SERVICES
QUALITY OF WORK
QUALITY STANDARDS
R&D
REGISTRATION PROCESS
REGISTRY
REGISTRY SYSTEM
REGULATORY AUTHORITY
REGULATORY ENVIRONMENT
REGULATORY FRAMEWORK
RESULT
RESULTS
RETENTION
RETURN
RETURNS
REVOLVING FUND
RISK MANAGEMENT
SITES
STANDARD CONTRACT
STANDARDIZATION
STATE BANK
STATE BANK OF PAKISTAN
SUPERVISION
TAX
TAX INCENTIVES
TECHNICAL ASSISTANCE
TECHNICAL EXPERTISE
TECHNICAL STAFF
TECHNICAL TRAINING
TELECOM
TELECOMMUNICATION
TIMELY PAYMENTS
TRANSPORT
TURNOVER
VERIFICATION
WITHHOLDING TAX
WITHHOLDING TAXES
spellingShingle ACCOUNT
ACCOUNTABILITY
ACCOUNTING
ACQUISITION
ADB
ADVERTISEMENTS
AUDITORS
AUDITS
AUTOMATION
AUTONOMY
AVAILABILITY OF CREDIT
BANK GUARANTEE
BANK GUARANTEES
BANKING INDUSTRY
BANKING SECTOR
BID
BIDS
BILLS
BOND
BONDS
BUDGETING
BUSINESS ADMINISTRATION
BUSINESS DEVELOPMENT
BUSINESS ENVIRONMENT
BUSINESS ENVIRONMENTS
BUSINESS PROCESSES
CAPABILITIES
CAPABILITY
CAPACITY BUILDING
CAPACITY CONSTRAINTS
CASH FLOW
CERTIFICATE
CHECKS
COLLATERAL
COMMERCIAL BANK
COMMERCIAL BANKS
COMMUNICATIONS TECHNOLOGY
COMPETITIVE BIDDING
COMPETITIVE PRICE
CONTRACTORS
CONTROL SYSTEM
CORPORATE TAX RATE
COST ESTIMATES
CREDIT LINES
CURRENCY
DEPOSIT
DEVELOPMENT BANK
DEVELOPMENT FINANCE
DISBURSEMENT
DISBURSEMENTS
DISPUTE RESOLUTION
DOMAIN
DOUBLE TAXATION
ECONOMIC CONDITIONS
ELECTRICITY
EQUIPMENT
ESCROW
EXCHANGE COMMISSION
EXPENDITURE
EXPENDITURES
FINANCES
FINANCIAL INSTITUTIONS
FINANCIAL STRENGTH
FINANCIAL SUPPORT
FORM OF COLLATERAL
FUTURE CONTRACTS
HOUSING
HUMAN RESOURCE
HUMAN RESOURCE DEVELOPMENT
HUMAN RESOURCES
ICT
IMAGE
IMPLEMENTING AGENCIES
INCOME TAX
INFLATION
INFORMATION SYSTEMS
INFRASTRUCTURE DEVELOPMENT
INFRASTRUCTURE MANAGEMENT
INSTITUTIONAL SUPPORT
INSURANCE
INTERNAL SYSTEM
INTERNATIONAL BANK
INTERNATIONAL BEST PRACTICES
INTERNATIONAL CONSULTANTS
INTERNATIONAL DEVELOPMENT
INTERNATIONAL FINANCE
INTERNATIONAL MARKET
INTERNATIONAL MARKETS
INTERNATIONAL STANDARDS
INVESTING
ISLAMIC BANK
JOINT VENTURES
LACK OF TRANSPARENCY
LENDER
LENDING PORTFOLIO
LETTER OF CREDIT
LEVEL PLAYING FIELD
LEVIES
LIABILITY
LOCAL CAPACITY
MANDATES
MATERIAL
MIDDLE EAST
MONITORING MECHANISM
NET PROFIT
NEW ENTRANTS
NEW TECHNOLOGY
OVERHEAD
PC
PRIVATE PARTNERSHIPS
PRIVATE SECTOR
PRIVATE SECTOR FIRMS
PROCUREMENT
PROCUREMENTS
PRODUCTIVITY
PROJECT MANAGEMENT
PRUDENTIAL REGULATIONS
PUBLIC DISCLOSURE
PUBLIC SPENDING
QUALITY ASSURANCE
QUALITY OF EDUCATION
QUALITY OF SERVICES
QUALITY OF WORK
QUALITY STANDARDS
R&D
REGISTRATION PROCESS
REGISTRY
REGISTRY SYSTEM
REGULATORY AUTHORITY
REGULATORY ENVIRONMENT
REGULATORY FRAMEWORK
RESULT
RESULTS
RETENTION
RETURN
RETURNS
REVOLVING FUND
RISK MANAGEMENT
SITES
STANDARD CONTRACT
STANDARDIZATION
STATE BANK
STATE BANK OF PAKISTAN
SUPERVISION
TAX
TAX INCENTIVES
TECHNICAL ASSISTANCE
TECHNICAL EXPERTISE
TECHNICAL STAFF
TECHNICAL TRAINING
TELECOM
TELECOMMUNICATION
TIMELY PAYMENTS
TRANSPORT
TURNOVER
VERIFICATION
WITHHOLDING TAX
WITHHOLDING TAXES
Mir, Aized H.
Malik, Ermeena
Durrani, Amer Z.
Focus Group Discussion
geographic_facet South Asia
Pakistan
description The Pakistan Infrastructure Implementation Capacity Assessment (PIICA) study was initiated in response to a specific request from the Government of Pakistan (GoP) to study the capacity of the local construction industry (client institutions, contractors and consultants) to deliver the planned infrastructure projects under the Medium Term Development Framework (MTDF). The objectives of the focus group discussions were to: (i) ensure active participation and ownership of stakeholders in the study; (ii) obtain concurrence on the framework for the study and the technical analyses to be carried out; and (iii) obtain feedback and comments on findings and develop consensus on the way forward. Focus group discussions helped identify the broad thematic areas and the issues which should be researched. The discussion provided a framework for preparation of a detailed questionnaire to be used for ascertaining stakeholders' perceptions about the industry and to solicit their comments and suggestions. The focus group also identified the need for carrying out separate technical analyses and emphasized that case studies of various projects should be prepared. The focus group discussions validated the results obtained from the perceptions surveys and the technical analyses and the stakeholders concurred with the complex issues and challenges faced by the construction industry. While valuable suggestions were provided in the focus group discussions which can remove a number of constraints faced by the industry, there were no solutions offered which could be implemented to provide increased capacity over the short-term as the systematic weaknesses in the business environment, the lack of adequately skilled human resource (HR), lack of client agencies capacity, lack of financing, and credit available to the industry and other constraints cannot be addressed within an immediate or short-term time frame clearly, besides taking measures to develop the local construction industry, innovative methods of procurement, and delivery mechanisms will need to be thought of in order to meet all of the MTDF infrastructure development goals.
format Economic & Sector Work :: Policy Note
author Mir, Aized H.
Malik, Ermeena
Durrani, Amer Z.
author_facet Mir, Aized H.
Malik, Ermeena
Durrani, Amer Z.
author_sort Mir, Aized H.
title Focus Group Discussion
title_short Focus Group Discussion
title_full Focus Group Discussion
title_fullStr Focus Group Discussion
title_full_unstemmed Focus Group Discussion
title_sort focus group discussion
publisher World Bank, Washington, DC
publishDate 2014
url http://documents.worldbank.org/curated/en/2007/11/9367845/focus-group-discussion
http://hdl.handle.net/10986/19544
_version_ 1764441361227972608
spelling okr-10986-195442021-04-23T14:03:46Z Focus Group Discussion Mir, Aized H. Malik, Ermeena Durrani, Amer Z. ACCOUNT ACCOUNTABILITY ACCOUNTING ACQUISITION ADB ADVERTISEMENTS AUDITORS AUDITS AUTOMATION AUTONOMY AVAILABILITY OF CREDIT BANK GUARANTEE BANK GUARANTEES BANKING INDUSTRY BANKING SECTOR BID BIDS BILLS BOND BONDS BUDGETING BUSINESS ADMINISTRATION BUSINESS DEVELOPMENT BUSINESS ENVIRONMENT BUSINESS ENVIRONMENTS BUSINESS PROCESSES CAPABILITIES CAPABILITY CAPACITY BUILDING CAPACITY CONSTRAINTS CASH FLOW CERTIFICATE CHECKS COLLATERAL COMMERCIAL BANK COMMERCIAL BANKS COMMUNICATIONS TECHNOLOGY COMPETITIVE BIDDING COMPETITIVE PRICE CONTRACTORS CONTROL SYSTEM CORPORATE TAX RATE COST ESTIMATES CREDIT LINES CURRENCY DEPOSIT DEVELOPMENT BANK DEVELOPMENT FINANCE DISBURSEMENT DISBURSEMENTS DISPUTE RESOLUTION DOMAIN DOUBLE TAXATION ECONOMIC CONDITIONS ELECTRICITY EQUIPMENT ESCROW EXCHANGE COMMISSION EXPENDITURE EXPENDITURES FINANCES FINANCIAL INSTITUTIONS FINANCIAL STRENGTH FINANCIAL SUPPORT FORM OF COLLATERAL FUTURE CONTRACTS HOUSING HUMAN RESOURCE HUMAN RESOURCE DEVELOPMENT HUMAN RESOURCES ICT IMAGE IMPLEMENTING AGENCIES INCOME TAX INFLATION INFORMATION SYSTEMS INFRASTRUCTURE DEVELOPMENT INFRASTRUCTURE MANAGEMENT INSTITUTIONAL SUPPORT INSURANCE INTERNAL SYSTEM INTERNATIONAL BANK INTERNATIONAL BEST PRACTICES INTERNATIONAL CONSULTANTS INTERNATIONAL DEVELOPMENT INTERNATIONAL FINANCE INTERNATIONAL MARKET INTERNATIONAL MARKETS INTERNATIONAL STANDARDS INVESTING ISLAMIC BANK JOINT VENTURES LACK OF TRANSPARENCY LENDER LENDING PORTFOLIO LETTER OF CREDIT LEVEL PLAYING FIELD LEVIES LIABILITY LOCAL CAPACITY MANDATES MATERIAL MIDDLE EAST MONITORING MECHANISM NET PROFIT NEW ENTRANTS NEW TECHNOLOGY OVERHEAD PC PRIVATE PARTNERSHIPS PRIVATE SECTOR PRIVATE SECTOR FIRMS PROCUREMENT PROCUREMENTS PRODUCTIVITY PROJECT MANAGEMENT PRUDENTIAL REGULATIONS PUBLIC DISCLOSURE PUBLIC SPENDING QUALITY ASSURANCE QUALITY OF EDUCATION QUALITY OF SERVICES QUALITY OF WORK QUALITY STANDARDS R&D REGISTRATION PROCESS REGISTRY REGISTRY SYSTEM REGULATORY AUTHORITY REGULATORY ENVIRONMENT REGULATORY FRAMEWORK RESULT RESULTS RETENTION RETURN RETURNS REVOLVING FUND RISK MANAGEMENT SITES STANDARD CONTRACT STANDARDIZATION STATE BANK STATE BANK OF PAKISTAN SUPERVISION TAX TAX INCENTIVES TECHNICAL ASSISTANCE TECHNICAL EXPERTISE TECHNICAL STAFF TECHNICAL TRAINING TELECOM TELECOMMUNICATION TIMELY PAYMENTS TRANSPORT TURNOVER VERIFICATION WITHHOLDING TAX WITHHOLDING TAXES The Pakistan Infrastructure Implementation Capacity Assessment (PIICA) study was initiated in response to a specific request from the Government of Pakistan (GoP) to study the capacity of the local construction industry (client institutions, contractors and consultants) to deliver the planned infrastructure projects under the Medium Term Development Framework (MTDF). The objectives of the focus group discussions were to: (i) ensure active participation and ownership of stakeholders in the study; (ii) obtain concurrence on the framework for the study and the technical analyses to be carried out; and (iii) obtain feedback and comments on findings and develop consensus on the way forward. Focus group discussions helped identify the broad thematic areas and the issues which should be researched. The discussion provided a framework for preparation of a detailed questionnaire to be used for ascertaining stakeholders' perceptions about the industry and to solicit their comments and suggestions. The focus group also identified the need for carrying out separate technical analyses and emphasized that case studies of various projects should be prepared. The focus group discussions validated the results obtained from the perceptions surveys and the technical analyses and the stakeholders concurred with the complex issues and challenges faced by the construction industry. While valuable suggestions were provided in the focus group discussions which can remove a number of constraints faced by the industry, there were no solutions offered which could be implemented to provide increased capacity over the short-term as the systematic weaknesses in the business environment, the lack of adequately skilled human resource (HR), lack of client agencies capacity, lack of financing, and credit available to the industry and other constraints cannot be addressed within an immediate or short-term time frame clearly, besides taking measures to develop the local construction industry, innovative methods of procurement, and delivery mechanisms will need to be thought of in order to meet all of the MTDF infrastructure development goals. 2014-08-21T14:18:53Z 2014-08-21T14:18:53Z 2007-11 http://documents.worldbank.org/curated/en/2007/11/9367845/focus-group-discussion http://hdl.handle.net/10986/19544 English en_US CC BY 3.0 IGO http://creativecommons.org/licenses/by/3.0/igo/ World Bank, Washington, DC Economic & Sector Work :: Policy Note Economic & Sector Work South Asia Pakistan