Review of Power System Expansion Planning in Vietnam

This report assesses current energy expansion planning practices in Vietnam. This assessment comprises both technical aspects (methodology, planning criteria, construction of scenarios, sensitivity analysis and others) and evaluation of recent plan...

Full description

Bibliographic Details
Main Author: Pereira, Mario
Format: Energy Study
Language:English
en_US
Published: World Bank, Washington, DC 2013
Subjects:
Online Access:http://documents.worldbank.org/curated/en/2008/06/16413187/vietnam-review-power-system-expansion-planning-vietnam
http://hdl.handle.net/10986/12859
id okr-10986-12859
recordtype oai_dc
spelling okr-10986-128592021-04-23T14:03:03Z Review of Power System Expansion Planning in Vietnam Pereira, Mario ADEQUATE REPRESENTATION APPROACH AVAILABILITY BENCHMARKING BIOMASS CO2 EMISSIONS COAL COAL PLANT COMPETITIVE POWER COMPETITIVE POWER MARKET COMPETITIVENESS ECONOMIC EVALUATION ECONOMIC GROWTH ECONOMIC POWER ELASTICITY ELECTRICITY ELECTRICITY CONSUMPTION ELECTRICITY SUPPLY EMISSIONS ENERGY BALANCE ENERGY CONSUMPTION ENERGY PRODUCTION EQUIPMENT OUTAGES FOSSIL FOSSIL FUELS FUEL FUEL COST FUEL COSTS FUEL PRICES FUEL SUPPLY GAS GAS CONSUMPTION GAS FIELDS GDP GDP GROWTH RATE GENERATION GENERATION EXPANSION GROWTH RATE GROWTH RATES HOUSEHOLD CONSUMPTION HYDRO PLANT HYDRO POWER HYDRO POWER PLANTS HYDROELECTRIC PLANT HYDROELECTRIC PLANTS HYDROELECTRIC POWER HYDROPOWER INDUSTRIAL DEVELOPMENT INFRASTRUCTURE INVESTMENTS INFRASTRUCTURE PROJECTS INVESTMENT COSTS INVESTMENT OPPORTUNITIES LOAD CURVE LOAD PROFILE LOAD SHAPE MARGINAL COST MARGINAL COSTS NATURAL GAS NATURAL GAS PLANTS NATURAL GAS PRICES NATURAL GAS RESOURCES NATURAL GAS SECTOR NUCLEAR PLANTS OPPORTUNITY COST OPTIMIZATION PEAK LOAD PEAK PRODUCTION PLANT PRODUCTION POWER POWER CORPORATION POWER GENERATION POWER PLANT POWER PLANTS POWER PRODUCTION POWER SECTOR POWER SYSTEM POWER SYSTEMS PRESENT VALUE PRICE OF COAL PRODUCTION COSTS PROGRAMMING PUBLIC INVESTMENT RENEWABLE ENERGY RENEWABLE ENERGY PROJECTS SENSITIVITY SCENARIOS THERMAL PLANT THERMAL PLANTS THERMAL POWER THERMAL POWER PLANTS TRANSFER OF ENERGY TRANSMISSION CONSTRAINTS WIND WIND ENERGY WIND POWER This report assesses current energy expansion planning practices in Vietnam. This assessment comprises both technical aspects (methodology, planning criteria, construction of scenarios, sensitivity analysis and others) and evaluation of recent planning studies. In addition to an assessment of planning practices, it includes proposing a number of scenarios for the local consultant to carry out least cost runs, including lower rates of demand growth, different fuel price assumptions and delays in plant construction, to assess the viability of specific projects without forcing them into the system plan. This report is the deliverable for Task 1, with an overview and comments of current practices for system expansion planning, hydropower and thermal power planning in Vietnam. The report also covers Task 2, by proposing and agreeing scenarios after meetings with IoE. Chapters 2 through 5 describe the current planning practices and the basic components and assumption of the IoE planning scenarios and outputs, namely: (i) load scenario; (ii) planning guidelines; (iii) planning objective and computational tools; and (iv) generation expansion plan. Chapter 6 presents suggestions for sensitivity scenarios, used to evaluate the competitiveness of the Trung Son hydro project and the Nghi Son thermal project. 2013-03-24T00:10:49Z 2013-03-24T00:10:49Z 2008-06-23 http://documents.worldbank.org/curated/en/2008/06/16413187/vietnam-review-power-system-expansion-planning-vietnam http://hdl.handle.net/10986/12859 English en_US CC BY 3.0 IGO http://creativecommons.org/licenses/by/3.0/igo/ World Bank World Bank, Washington, DC Economic & Sector Work :: Energy Study Economic & Sector Work East Asia and Pacific Vietnam
repository_type Digital Repository
institution_category Foreign Institution
institution Digital Repositories
building World Bank Open Knowledge Repository
collection World Bank
language English
en_US
topic ADEQUATE REPRESENTATION
APPROACH
AVAILABILITY
BENCHMARKING
BIOMASS
CO2 EMISSIONS
COAL
COAL PLANT
COMPETITIVE POWER
COMPETITIVE POWER MARKET
COMPETITIVENESS
ECONOMIC EVALUATION
ECONOMIC GROWTH
ECONOMIC POWER
ELASTICITY
ELECTRICITY
ELECTRICITY CONSUMPTION
ELECTRICITY SUPPLY
EMISSIONS
ENERGY BALANCE
ENERGY CONSUMPTION
ENERGY PRODUCTION
EQUIPMENT OUTAGES
FOSSIL
FOSSIL FUELS
FUEL
FUEL COST
FUEL COSTS
FUEL PRICES
FUEL SUPPLY
GAS
GAS CONSUMPTION
GAS FIELDS
GDP
GDP GROWTH RATE
GENERATION
GENERATION EXPANSION
GROWTH RATE
GROWTH RATES
HOUSEHOLD CONSUMPTION
HYDRO PLANT
HYDRO POWER
HYDRO POWER PLANTS
HYDROELECTRIC PLANT
HYDROELECTRIC PLANTS
HYDROELECTRIC POWER
HYDROPOWER
INDUSTRIAL DEVELOPMENT
INFRASTRUCTURE INVESTMENTS
INFRASTRUCTURE PROJECTS
INVESTMENT COSTS
INVESTMENT OPPORTUNITIES
LOAD CURVE
LOAD PROFILE
LOAD SHAPE
MARGINAL COST
MARGINAL COSTS
NATURAL GAS
NATURAL GAS PLANTS
NATURAL GAS PRICES
NATURAL GAS RESOURCES
NATURAL GAS SECTOR
NUCLEAR PLANTS
OPPORTUNITY COST
OPTIMIZATION
PEAK LOAD
PEAK PRODUCTION
PLANT PRODUCTION
POWER
POWER CORPORATION
POWER GENERATION
POWER PLANT
POWER PLANTS
POWER PRODUCTION
POWER SECTOR
POWER SYSTEM
POWER SYSTEMS
PRESENT VALUE
PRICE OF COAL
PRODUCTION COSTS
PROGRAMMING
PUBLIC INVESTMENT
RENEWABLE ENERGY
RENEWABLE ENERGY PROJECTS
SENSITIVITY SCENARIOS
THERMAL PLANT
THERMAL PLANTS
THERMAL POWER
THERMAL POWER PLANTS
TRANSFER OF ENERGY
TRANSMISSION CONSTRAINTS
WIND
WIND ENERGY
WIND POWER
spellingShingle ADEQUATE REPRESENTATION
APPROACH
AVAILABILITY
BENCHMARKING
BIOMASS
CO2 EMISSIONS
COAL
COAL PLANT
COMPETITIVE POWER
COMPETITIVE POWER MARKET
COMPETITIVENESS
ECONOMIC EVALUATION
ECONOMIC GROWTH
ECONOMIC POWER
ELASTICITY
ELECTRICITY
ELECTRICITY CONSUMPTION
ELECTRICITY SUPPLY
EMISSIONS
ENERGY BALANCE
ENERGY CONSUMPTION
ENERGY PRODUCTION
EQUIPMENT OUTAGES
FOSSIL
FOSSIL FUELS
FUEL
FUEL COST
FUEL COSTS
FUEL PRICES
FUEL SUPPLY
GAS
GAS CONSUMPTION
GAS FIELDS
GDP
GDP GROWTH RATE
GENERATION
GENERATION EXPANSION
GROWTH RATE
GROWTH RATES
HOUSEHOLD CONSUMPTION
HYDRO PLANT
HYDRO POWER
HYDRO POWER PLANTS
HYDROELECTRIC PLANT
HYDROELECTRIC PLANTS
HYDROELECTRIC POWER
HYDROPOWER
INDUSTRIAL DEVELOPMENT
INFRASTRUCTURE INVESTMENTS
INFRASTRUCTURE PROJECTS
INVESTMENT COSTS
INVESTMENT OPPORTUNITIES
LOAD CURVE
LOAD PROFILE
LOAD SHAPE
MARGINAL COST
MARGINAL COSTS
NATURAL GAS
NATURAL GAS PLANTS
NATURAL GAS PRICES
NATURAL GAS RESOURCES
NATURAL GAS SECTOR
NUCLEAR PLANTS
OPPORTUNITY COST
OPTIMIZATION
PEAK LOAD
PEAK PRODUCTION
PLANT PRODUCTION
POWER
POWER CORPORATION
POWER GENERATION
POWER PLANT
POWER PLANTS
POWER PRODUCTION
POWER SECTOR
POWER SYSTEM
POWER SYSTEMS
PRESENT VALUE
PRICE OF COAL
PRODUCTION COSTS
PROGRAMMING
PUBLIC INVESTMENT
RENEWABLE ENERGY
RENEWABLE ENERGY PROJECTS
SENSITIVITY SCENARIOS
THERMAL PLANT
THERMAL PLANTS
THERMAL POWER
THERMAL POWER PLANTS
TRANSFER OF ENERGY
TRANSMISSION CONSTRAINTS
WIND
WIND ENERGY
WIND POWER
Pereira, Mario
Review of Power System Expansion Planning in Vietnam
geographic_facet East Asia and Pacific
Vietnam
description This report assesses current energy expansion planning practices in Vietnam. This assessment comprises both technical aspects (methodology, planning criteria, construction of scenarios, sensitivity analysis and others) and evaluation of recent planning studies. In addition to an assessment of planning practices, it includes proposing a number of scenarios for the local consultant to carry out least cost runs, including lower rates of demand growth, different fuel price assumptions and delays in plant construction, to assess the viability of specific projects without forcing them into the system plan. This report is the deliverable for Task 1, with an overview and comments of current practices for system expansion planning, hydropower and thermal power planning in Vietnam. The report also covers Task 2, by proposing and agreeing scenarios after meetings with IoE. Chapters 2 through 5 describe the current planning practices and the basic components and assumption of the IoE planning scenarios and outputs, namely: (i) load scenario; (ii) planning guidelines; (iii) planning objective and computational tools; and (iv) generation expansion plan. Chapter 6 presents suggestions for sensitivity scenarios, used to evaluate the competitiveness of the Trung Son hydro project and the Nghi Son thermal project.
format Economic & Sector Work :: Energy Study
author Pereira, Mario
author_facet Pereira, Mario
author_sort Pereira, Mario
title Review of Power System Expansion Planning in Vietnam
title_short Review of Power System Expansion Planning in Vietnam
title_full Review of Power System Expansion Planning in Vietnam
title_fullStr Review of Power System Expansion Planning in Vietnam
title_full_unstemmed Review of Power System Expansion Planning in Vietnam
title_sort review of power system expansion planning in vietnam
publisher World Bank, Washington, DC
publishDate 2013
url http://documents.worldbank.org/curated/en/2008/06/16413187/vietnam-review-power-system-expansion-planning-vietnam
http://hdl.handle.net/10986/12859
_version_ 1764421115416936448