Asmara Power Distribution and Rural Electrification Project : Pre-electrification Survey Analysis

This report presents the findings and recommendations of a Pre-electrification Survey done in preparation for the Asmara Power Distribution and Rural Electrification Project. The survey was designed to characterize energy use in existing institutio...

Full description

Bibliographic Details
Main Authors: O'Sullivan, Kyran, Fitzgerald, Kevin
Format: Energy Study
Language:English
en_US
Published: World Bank, Washington, DC 2013
Subjects:
Online Access:http://documents.worldbank.org/curated/en/2006/04/16599558/eritrea-pre-electrification-survey-analysis
http://hdl.handle.net/10986/12590
Description
Summary:This report presents the findings and recommendations of a Pre-electrification Survey done in preparation for the Asmara Power Distribution and Rural Electrification Project. The survey was designed to characterize energy use in existing institutions, commercial enterprises and households before electrification and, thereby, set a baseline for monitoring and evaluation of the impacts of the project going forward. The report begins with a summary of the survey s main findings. It continues with an introduction describing the background of the project. Section 1 presents an estimation of electrification s benefits using the household survey data. Section 2 discusses recommendations for ongoing monitoring and evaluation of the project. An appendix follows.