Asmara Power Distribution and Rural Electrification Project : Pre-electrification Survey Analysis
This report presents the findings and recommendations of a Pre-electrification Survey done in preparation for the Asmara Power Distribution and Rural Electrification Project. The survey was designed to characterize energy use in existing institutio...
Main Authors: | , |
---|---|
Format: | Energy Study |
Language: | English en_US |
Published: |
World Bank, Washington, DC
2013
|
Subjects: | |
Online Access: | http://documents.worldbank.org/curated/en/2006/04/16599558/eritrea-pre-electrification-survey-analysis http://hdl.handle.net/10986/12590 |
Summary: | This report presents the findings and
recommendations of a Pre-electrification Survey done in
preparation for the Asmara Power Distribution and Rural
Electrification Project. The survey was designed to
characterize energy use in existing institutions, commercial
enterprises and households before electrification and,
thereby, set a baseline for monitoring and evaluation of the
impacts of the project going forward. The report begins with
a summary of the survey s main findings. It continues with
an introduction describing the background of the project.
Section 1 presents an estimation of electrification s
benefits using the household survey data. Section 2
discusses recommendations for ongoing monitoring and
evaluation of the project. An appendix follows. |
---|