Maintaining Roads : The Argentine Experience with Output-Based Contracts
The Argentine government is using output-based contracts with the private sector for rehabilitation and maintenance of its nonconcessioned road network. The multiyear lump sum contracts, funded by the government, specify required road service outpu...
Main Author: | |
---|---|
Format: | Viewpoint |
Language: | English |
Published: |
World Bank, Washington, DC
2012
|
Subjects: | |
Online Access: | http://documents.worldbank.org/curated/en/2001/06/1346447/maintaining-roads-argentine-experience-output-based-contracts http://hdl.handle.net/10986/11379 |
id |
okr-10986-11379 |
---|---|
recordtype |
oai_dc |
spelling |
okr-10986-113792021-06-14T11:01:29Z Maintaining Roads : The Argentine Experience with Output-Based Contracts Liautaud, Gerard PRIVATE INFRASTRUCTURE PRIVATE INFRASTRUCTURE ROAD MAINTENANCE ROAD REHABILITATION CONTRACTS BIDDING ROAD & HIGHWAY MAINTENANCE ADMINISTRATIVE COSTS AXLE LOADS BIDDING BITUMEN CONTRACTING OUT CONTRACTORS COST OVERRUNS CRACKING CULVERTS DAILY TRAFFIC EXPENDITURES HIGHWAYS LUMP SUM CONTRACTS NET PRESENT VALUE OVERLAY PAVED ROADS PAVEMENT POTHOLES PRIVATE SECTOR QUALITY CONTROL QUALITY OF SERVICE RATE OF RETURN ROAD MAINTENANCE ROAD USERS ROADS ROUGHNESS ROUTINE MAINTENANCE SIGNS SPECIFICATIONS SPREADING TRAFFIC VEHICLE OVERLOAD VEHICLES The Argentine government is using output-based contracts with the private sector for rehabilitation and maintenance of its nonconcessioned road network. The multiyear lump sum contracts, funded by the government, specify required road service outputs and use incentive-based payment schedules to ensure the quality of the work. After three years of operation the 60 contracts (averaging US$10 million) in the first phase are working well. By 2002 around 75 percent of Argentina's nonconcessional roads should be operating under output-based contracts. 2012-08-13T14:54:32Z 2012-08-13T14:54:32Z 2001-06 http://documents.worldbank.org/curated/en/2001/06/1346447/maintaining-roads-argentine-experience-output-based-contracts Viewpoint. -- Note no. 231 (June 2001) http://hdl.handle.net/10986/11379 English Viewpoint CC BY 3.0 IGO http://creativecommons.org/licenses/by/3.0/igo/ World Bank World Bank, Washington, DC Publications & Research :: Viewpoint Publications & Research Latin America & Caribbean Argentina |
repository_type |
Digital Repository |
institution_category |
Foreign Institution |
institution |
Digital Repositories |
building |
World Bank Open Knowledge Repository |
collection |
World Bank |
language |
English |
topic |
PRIVATE INFRASTRUCTURE PRIVATE INFRASTRUCTURE ROAD MAINTENANCE ROAD REHABILITATION CONTRACTS BIDDING ROAD & HIGHWAY MAINTENANCE ADMINISTRATIVE COSTS AXLE LOADS BIDDING BITUMEN CONTRACTING OUT CONTRACTORS COST OVERRUNS CRACKING CULVERTS DAILY TRAFFIC EXPENDITURES HIGHWAYS LUMP SUM CONTRACTS NET PRESENT VALUE OVERLAY PAVED ROADS PAVEMENT POTHOLES PRIVATE SECTOR QUALITY CONTROL QUALITY OF SERVICE RATE OF RETURN ROAD MAINTENANCE ROAD USERS ROADS ROUGHNESS ROUTINE MAINTENANCE SIGNS SPECIFICATIONS SPREADING TRAFFIC VEHICLE OVERLOAD VEHICLES |
spellingShingle |
PRIVATE INFRASTRUCTURE PRIVATE INFRASTRUCTURE ROAD MAINTENANCE ROAD REHABILITATION CONTRACTS BIDDING ROAD & HIGHWAY MAINTENANCE ADMINISTRATIVE COSTS AXLE LOADS BIDDING BITUMEN CONTRACTING OUT CONTRACTORS COST OVERRUNS CRACKING CULVERTS DAILY TRAFFIC EXPENDITURES HIGHWAYS LUMP SUM CONTRACTS NET PRESENT VALUE OVERLAY PAVED ROADS PAVEMENT POTHOLES PRIVATE SECTOR QUALITY CONTROL QUALITY OF SERVICE RATE OF RETURN ROAD MAINTENANCE ROAD USERS ROADS ROUGHNESS ROUTINE MAINTENANCE SIGNS SPECIFICATIONS SPREADING TRAFFIC VEHICLE OVERLOAD VEHICLES Liautaud, Gerard Maintaining Roads : The Argentine Experience with Output-Based Contracts |
geographic_facet |
Latin America & Caribbean Argentina |
relation |
Viewpoint |
description |
The Argentine government is using
output-based contracts with the private sector for
rehabilitation and maintenance of its nonconcessioned road
network. The multiyear lump sum contracts, funded by the
government, specify required road service outputs and use
incentive-based payment schedules to ensure the quality of
the work. After three years of operation the 60 contracts
(averaging US$10 million) in the first phase are working
well. By 2002 around 75 percent of Argentina's
nonconcessional roads should be operating under output-based contracts. |
format |
Publications & Research :: Viewpoint |
author |
Liautaud, Gerard |
author_facet |
Liautaud, Gerard |
author_sort |
Liautaud, Gerard |
title |
Maintaining Roads : The Argentine Experience with Output-Based Contracts |
title_short |
Maintaining Roads : The Argentine Experience with Output-Based Contracts |
title_full |
Maintaining Roads : The Argentine Experience with Output-Based Contracts |
title_fullStr |
Maintaining Roads : The Argentine Experience with Output-Based Contracts |
title_full_unstemmed |
Maintaining Roads : The Argentine Experience with Output-Based Contracts |
title_sort |
maintaining roads : the argentine experience with output-based contracts |
publisher |
World Bank, Washington, DC |
publishDate |
2012 |
url |
http://documents.worldbank.org/curated/en/2001/06/1346447/maintaining-roads-argentine-experience-output-based-contracts http://hdl.handle.net/10986/11379 |
_version_ |
1764416523805392896 |