id okr-10986-10129
recordtype oai_dc
spelling okr-10986-101292021-04-23T14:02:48Z General Considerations for Infrastructure Planning Read, Geoffrey BRIDGE BUILDING CODES CITIES COMMUNITIES CONTINGENCY PLANS DISASTER DISASTER ASSISTANCE DISASTER COMMUNICATIONS DISASTER MANAGEMENT DISASTER MITIGATION DISASTER MITIGATION MEASURES DISASTER PREPAREDNESS DISASTER RECONSTRUCTION DISASTER RECOVERY DISASTER REDUCTION DISASTER RESPONSE DISASTER RISK DISASTER ZONES EARTHQUAKE EARTHQUAKE RECONSTRUCTION EARTHQUAKES ECONOMIC REGENERATION EFFECTS OF INFLATION INFRASTRUCTURE DEVELOPMENT INFRASTRUCTURE PLANNING INFRASTRUCTURE SERVICES INTERNATIONAL STRATEGY FOR DISASTER REDUCTION NATURAL DISASTERS RECONSTRUCTION RELIEF RELIEF EFFORTS RELIEF OPERATIONS RESCUE ROAD ROADS RURAL INFRASTRUCTURE TEMPORARY HOUSING TRANSPORT TSUNAMI URBAN DEVELOPMENT URBAN PLANNING URBAN SERVICES URBANIZATION WATER SUPPLY General considerations for the preparation of the infrastructure development plan, including communication, energy, transport, and water conservancy reconstruction are set out. This note complements the more specific recommendations provided in the urban development note. Planning for and implementation of the reconstruction of infrastructure should be based on recognizing the rapidly changing socioeconomic conditions in the province of Sichuan: (i) increasing urbanization and densification; (i) rising income levels and social aspirations; and (iii) unpredictable extremes in climatic and geotechnical conditions. These changes are partially offset by improved technical knowledge and understanding of possible responses and outcomes. Natural disasters are occurring more frequently; hence reconstruction planning and programs should be firmly based on policies that have disaster mitigation and response at their core. 2012-08-13T10:30:12Z 2012-08-13T10:30:12Z 2010-12 http://documents.worldbank.org/curated/en/2010/12/13337852/general-considerations-infrastructure-planning http://hdl.handle.net/10986/10129 English EAP DRM Knowledge Notes; No. 3 CC BY 3.0 IGO http://creativecommons.org/licenses/by/3.0/igo/ World Bank World Bank, Washington, DC Publications & Research :: Brief Publications & Research East Asia and Pacific
repository_type Digital Repository
institution_category Foreign Institution
institution Digital Repositories
building World Bank Open Knowledge Repository
collection World Bank
language English
topic BRIDGE
BUILDING CODES
CITIES
COMMUNITIES
CONTINGENCY PLANS
DISASTER
DISASTER ASSISTANCE
DISASTER COMMUNICATIONS
DISASTER MANAGEMENT
DISASTER MITIGATION
DISASTER MITIGATION MEASURES
DISASTER PREPAREDNESS
DISASTER RECONSTRUCTION
DISASTER RECOVERY
DISASTER REDUCTION
DISASTER RESPONSE
DISASTER RISK
DISASTER ZONES
EARTHQUAKE
EARTHQUAKE RECONSTRUCTION
EARTHQUAKES
ECONOMIC REGENERATION
EFFECTS OF INFLATION
INFRASTRUCTURE DEVELOPMENT
INFRASTRUCTURE PLANNING
INFRASTRUCTURE SERVICES
INTERNATIONAL STRATEGY FOR DISASTER REDUCTION
NATURAL DISASTERS
RECONSTRUCTION
RELIEF
RELIEF EFFORTS
RELIEF OPERATIONS
RESCUE
ROAD
ROADS
RURAL INFRASTRUCTURE
TEMPORARY HOUSING
TRANSPORT
TSUNAMI
URBAN DEVELOPMENT
URBAN PLANNING
URBAN SERVICES
URBANIZATION
WATER SUPPLY
spellingShingle BRIDGE
BUILDING CODES
CITIES
COMMUNITIES
CONTINGENCY PLANS
DISASTER
DISASTER ASSISTANCE
DISASTER COMMUNICATIONS
DISASTER MANAGEMENT
DISASTER MITIGATION
DISASTER MITIGATION MEASURES
DISASTER PREPAREDNESS
DISASTER RECONSTRUCTION
DISASTER RECOVERY
DISASTER REDUCTION
DISASTER RESPONSE
DISASTER RISK
DISASTER ZONES
EARTHQUAKE
EARTHQUAKE RECONSTRUCTION
EARTHQUAKES
ECONOMIC REGENERATION
EFFECTS OF INFLATION
INFRASTRUCTURE DEVELOPMENT
INFRASTRUCTURE PLANNING
INFRASTRUCTURE SERVICES
INTERNATIONAL STRATEGY FOR DISASTER REDUCTION
NATURAL DISASTERS
RECONSTRUCTION
RELIEF
RELIEF EFFORTS
RELIEF OPERATIONS
RESCUE
ROAD
ROADS
RURAL INFRASTRUCTURE
TEMPORARY HOUSING
TRANSPORT
TSUNAMI
URBAN DEVELOPMENT
URBAN PLANNING
URBAN SERVICES
URBANIZATION
WATER SUPPLY
Read, Geoffrey
General Considerations for Infrastructure Planning
geographic_facet East Asia and Pacific
relation EAP DRM Knowledge Notes; No. 3
description General considerations for the preparation of the infrastructure development plan, including communication, energy, transport, and water conservancy reconstruction are set out. This note complements the more specific recommendations provided in the urban development note. Planning for and implementation of the reconstruction of infrastructure should be based on recognizing the rapidly changing socioeconomic conditions in the province of Sichuan: (i) increasing urbanization and densification; (i) rising income levels and social aspirations; and (iii) unpredictable extremes in climatic and geotechnical conditions. These changes are partially offset by improved technical knowledge and understanding of possible responses and outcomes. Natural disasters are occurring more frequently; hence reconstruction planning and programs should be firmly based on policies that have disaster mitigation and response at their core.
format Publications & Research :: Brief
author Read, Geoffrey
author_facet Read, Geoffrey
author_sort Read, Geoffrey
title General Considerations for Infrastructure Planning
title_short General Considerations for Infrastructure Planning
title_full General Considerations for Infrastructure Planning
title_fullStr General Considerations for Infrastructure Planning
title_full_unstemmed General Considerations for Infrastructure Planning
title_sort general considerations for infrastructure planning
publisher World Bank, Washington, DC
publishDate 2012
url http://documents.worldbank.org/curated/en/2010/12/13337852/general-considerations-infrastructure-planning
http://hdl.handle.net/10986/10129
_version_ 1764411957587214336