The evaluation of implementing industrialized building system for construction industry in Malaysia

The main objectives of this paper are to investigate the significant factors of the implementation of Industrialized Building System (IBS), and the relationship between quality, cost and productivity. The preliminary idea to this research come from the national aspiration of Vision 2020 that...

Full description

Bibliographic Details
Main Authors: Ismail, Zulkefle, Abdul Rahim, Asiah
Format: Conference or Workshop Item
Language:English
Published: 2009
Subjects:
Online Access:http://irep.iium.edu.my/8920/
http://irep.iium.edu.my/8920/
http://irep.iium.edu.my/8920/1/The_Evaluation_of_Implementing_IBS_for_Construction_Industry_in_Malaysia_%281%29.pdf
id iium-8920
recordtype eprints
spelling iium-89202011-12-11T14:04:45Z http://irep.iium.edu.my/8920/ The evaluation of implementing industrialized building system for construction industry in Malaysia Ismail, Zulkefle Abdul Rahim, Asiah L Education (General) NA Architecture The main objectives of this paper are to investigate the significant factors of the implementation of Industrialized Building System (IBS), and the relationship between quality, cost and productivity. The preliminary idea to this research come from the national aspiration of Vision 2020 that is to transform and industrialized the Malaysian construction industry. A system architecture, which takes advantage of new technology, could change the entire construction industry. Most of housing industry in developing countries did not take the advantage of advancement in manufacturing industry especially the implementation of IBS. Factorymanufactured components are easy to assembled on-site, use less labour, faster to construct and it has a high quality which will add value to the houses. The methodology used in this study are questionnaire, semi-structured interviews and observation. They are used to identify the status of implementation of IBS in Malaysia. The findings identified that architects and engineers tend to reject the implementation of IBS in Malaysia. The needs to cut cost and improvement in quality of prefabricated components will give a greater drive to its usage in construction sites and achieved customer‟s satisfaction. The implementation of IBS could help to reduce construction time and site labour. It will also relieve the labour crisis, improved quality while keeping cost reasonable. Further development in prefabrication will also leads to closer integration between building services and manufacturing engineering without compromising the users preference. As a conclusion, to achieve the customer‟s needs and satisfaction, design guidelines need to be developing as a standard for construction practice in order to enhance the usage of IBS in Malaysia. The Malaysia government should play a greater role in exposing and encouraging the construction industry and the public to the next generation of prefabricated components design and technology. 2009 Conference or Workshop Item PeerReviewed application/pdf en http://irep.iium.edu.my/8920/1/The_Evaluation_of_Implementing_IBS_for_Construction_Industry_in_Malaysia_%281%29.pdf Ismail, Zulkefle and Abdul Rahim, Asiah (2009) The evaluation of implementing industrialized building system for construction industry in Malaysia. In: CIBW 107 International Symposium on Construction in Developing Economies: Commonalities Among Diversities, 5-7 October 2009, Penang, Malaysia. (Unpublished) http://www.cibworld.nl/site/home/index.html
repository_type Digital Repository
institution_category Local University
institution International Islamic University Malaysia
building IIUM Repository
collection Online Access
language English
topic L Education (General)
NA Architecture
spellingShingle L Education (General)
NA Architecture
Ismail, Zulkefle
Abdul Rahim, Asiah
The evaluation of implementing industrialized building system for construction industry in Malaysia
description The main objectives of this paper are to investigate the significant factors of the implementation of Industrialized Building System (IBS), and the relationship between quality, cost and productivity. The preliminary idea to this research come from the national aspiration of Vision 2020 that is to transform and industrialized the Malaysian construction industry. A system architecture, which takes advantage of new technology, could change the entire construction industry. Most of housing industry in developing countries did not take the advantage of advancement in manufacturing industry especially the implementation of IBS. Factorymanufactured components are easy to assembled on-site, use less labour, faster to construct and it has a high quality which will add value to the houses. The methodology used in this study are questionnaire, semi-structured interviews and observation. They are used to identify the status of implementation of IBS in Malaysia. The findings identified that architects and engineers tend to reject the implementation of IBS in Malaysia. The needs to cut cost and improvement in quality of prefabricated components will give a greater drive to its usage in construction sites and achieved customer‟s satisfaction. The implementation of IBS could help to reduce construction time and site labour. It will also relieve the labour crisis, improved quality while keeping cost reasonable. Further development in prefabrication will also leads to closer integration between building services and manufacturing engineering without compromising the users preference. As a conclusion, to achieve the customer‟s needs and satisfaction, design guidelines need to be developing as a standard for construction practice in order to enhance the usage of IBS in Malaysia. The Malaysia government should play a greater role in exposing and encouraging the construction industry and the public to the next generation of prefabricated components design and technology.
format Conference or Workshop Item
author Ismail, Zulkefle
Abdul Rahim, Asiah
author_facet Ismail, Zulkefle
Abdul Rahim, Asiah
author_sort Ismail, Zulkefle
title The evaluation of implementing industrialized building system for construction industry in Malaysia
title_short The evaluation of implementing industrialized building system for construction industry in Malaysia
title_full The evaluation of implementing industrialized building system for construction industry in Malaysia
title_fullStr The evaluation of implementing industrialized building system for construction industry in Malaysia
title_full_unstemmed The evaluation of implementing industrialized building system for construction industry in Malaysia
title_sort evaluation of implementing industrialized building system for construction industry in malaysia
publishDate 2009
url http://irep.iium.edu.my/8920/
http://irep.iium.edu.my/8920/
http://irep.iium.edu.my/8920/1/The_Evaluation_of_Implementing_IBS_for_Construction_Industry_in_Malaysia_%281%29.pdf
first_indexed 2023-09-18T20:18:43Z
last_indexed 2023-09-18T20:18:43Z
_version_ 1777407962870972416