Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period
In this paper power energy had been estimated based on actual wind speed records in a coastal city in Palestine Ashdod. The main aims of this study to determine the feasibility of wind turbine and to estimate payback period. Therefore, to encourage investment in renewable energy in Palestine. Th...
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English English |
Published: |
Institute of Advanced Engineering and Science ( IAES )
2019
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/74807/ http://irep.iium.edu.my/74807/ http://irep.iium.edu.my/74807/ http://irep.iium.edu.my/74807/1/17347-38598-1-PB_2%20%282%29.pdf http://irep.iium.edu.my/74807/7/74807_Practical%20electrical%20energy%20production%20to%20solve%20the%20shortage%20in%20electricity%20in%20palestine%20and%20pay%20back%20period_Scopus.pdf |
id |
iium-74807 |
---|---|
recordtype |
eprints |
spelling |
iium-748072019-11-24T13:33:41Z http://irep.iium.edu.my/74807/ Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period Badawi, Ahmed S.A. Hasbullah, Nurul Fadzlin Yusoff, Siti Hajar Abdalla Hashim, Aisha Hassan Elamassie, Mohammed TK4001 Applications of electric power In this paper power energy had been estimated based on actual wind speed records in a coastal city in Palestine Ashdod. The main aims of this study to determine the feasibility of wind turbine and to estimate payback period. Therefore, to encourage investment in renewable energy in Palestine. The daily average wind speed data had been analyzed and fitted to the Weibull probability distribution function. The parameters of Weibull had been calculated by author using Graphical method the applied example wind turbine is 5kw wind turbine generator this is suitable turbine for small scale based on wind speed records on the coastal plain of Palestine. This study calculated the energy that can produce from wind turbine to estimate the revenue of any possible project in wind energy conversion system based on unit area. Energy has been calculated wind energy using two different method based on Weibull data and measured data. The total amount of energy for 2010 is 10749.8 kw.hr/m2 based on measured wind speed. Payback period for the project in wind energy turbines is around 3 years which make the generation electricity possible for small scale but not commercial. This study will lead to assess the wind energy production in Palestine to encourage investment in renewable energy sectors. Institute of Advanced Engineering and Science ( IAES ) 2019-12 Article PeerReviewed application/pdf en http://irep.iium.edu.my/74807/1/17347-38598-1-PB_2%20%282%29.pdf application/pdf en http://irep.iium.edu.my/74807/7/74807_Practical%20electrical%20energy%20production%20to%20solve%20the%20shortage%20in%20electricity%20in%20palestine%20and%20pay%20back%20period_Scopus.pdf Badawi, Ahmed S.A. and Hasbullah, Nurul Fadzlin and Yusoff, Siti Hajar and Abdalla Hashim, Aisha Hassan and Elamassie, Mohammed (2019) Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period. International Journal of Electrical and Computer Engineering (IJECE), 9 (6). pp. 4610-4616. ISSN 2088-8708 http://ijece.iaescore.com/index.php/IJECE 10.11591/ijece.v9i6.pp4610-4616 |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
International Islamic University Malaysia |
building |
IIUM Repository |
collection |
Online Access |
language |
English English |
topic |
TK4001 Applications of electric power |
spellingShingle |
TK4001 Applications of electric power Badawi, Ahmed S.A. Hasbullah, Nurul Fadzlin Yusoff, Siti Hajar Abdalla Hashim, Aisha Hassan Elamassie, Mohammed Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period |
description |
In this paper power energy had been estimated based on actual wind speed
records in a coastal city in Palestine Ashdod. The main aims of this study to
determine the feasibility of wind turbine and to estimate payback period.
Therefore, to encourage investment in renewable energy in Palestine.
The daily average wind speed data had been analyzed and fitted to
the Weibull probability distribution function. The parameters of Weibull had
been calculated by author using Graphical method the applied example wind
turbine is 5kw wind turbine generator this is suitable turbine for small scale
based on wind speed records on the coastal plain of Palestine. This study
calculated the energy that can produce from wind turbine to estimate
the revenue of any possible project in wind energy conversion system based
on unit area. Energy has been calculated wind energy using two different
method based on Weibull data and measured data. The total amount of
energy for 2010 is 10749.8 kw.hr/m2 based on measured wind speed.
Payback period for the project in wind energy turbines is around 3 years
which make the generation electricity possible for small scale but not
commercial. This study will lead to assess the wind energy production in
Palestine to encourage investment in renewable energy sectors. |
format |
Article |
author |
Badawi, Ahmed S.A. Hasbullah, Nurul Fadzlin Yusoff, Siti Hajar Abdalla Hashim, Aisha Hassan Elamassie, Mohammed |
author_facet |
Badawi, Ahmed S.A. Hasbullah, Nurul Fadzlin Yusoff, Siti Hajar Abdalla Hashim, Aisha Hassan Elamassie, Mohammed |
author_sort |
Badawi, Ahmed S.A. |
title |
Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period |
title_short |
Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period |
title_full |
Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period |
title_fullStr |
Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period |
title_full_unstemmed |
Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period |
title_sort |
practical electrical energy production to solve the shortage in electricity in palestine and pay back period |
publisher |
Institute of Advanced Engineering and Science ( IAES ) |
publishDate |
2019 |
url |
http://irep.iium.edu.my/74807/ http://irep.iium.edu.my/74807/ http://irep.iium.edu.my/74807/ http://irep.iium.edu.my/74807/1/17347-38598-1-PB_2%20%282%29.pdf http://irep.iium.edu.my/74807/7/74807_Practical%20electrical%20energy%20production%20to%20solve%20the%20shortage%20in%20electricity%20in%20palestine%20and%20pay%20back%20period_Scopus.pdf |
first_indexed |
2023-09-18T21:45:52Z |
last_indexed |
2023-09-18T21:45:52Z |
_version_ |
1777413445338005504 |