Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period

In this paper power energy had been estimated based on actual wind speed records in a coastal city in Palestine Ashdod. The main aims of this study to determine the feasibility of wind turbine and to estimate payback period. Therefore, to encourage investment in renewable energy in Palestine. Th...

Full description

Bibliographic Details
Main Authors: Badawi, Ahmed S.A., Hasbullah, Nurul Fadzlin, Yusoff, Siti Hajar, Abdalla Hashim, Aisha Hassan, Elamassie, Mohammed
Format: Article
Language:English
English
Published: Institute of Advanced Engineering and Science ( IAES ) 2019
Subjects:
Online Access:http://irep.iium.edu.my/74807/
http://irep.iium.edu.my/74807/
http://irep.iium.edu.my/74807/
http://irep.iium.edu.my/74807/1/17347-38598-1-PB_2%20%282%29.pdf
http://irep.iium.edu.my/74807/7/74807_Practical%20electrical%20energy%20production%20to%20solve%20the%20shortage%20in%20electricity%20in%20palestine%20and%20pay%20back%20period_Scopus.pdf
id iium-74807
recordtype eprints
spelling iium-748072019-11-24T13:33:41Z http://irep.iium.edu.my/74807/ Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period Badawi, Ahmed S.A. Hasbullah, Nurul Fadzlin Yusoff, Siti Hajar Abdalla Hashim, Aisha Hassan Elamassie, Mohammed TK4001 Applications of electric power In this paper power energy had been estimated based on actual wind speed records in a coastal city in Palestine Ashdod. The main aims of this study to determine the feasibility of wind turbine and to estimate payback period. Therefore, to encourage investment in renewable energy in Palestine. The daily average wind speed data had been analyzed and fitted to the Weibull probability distribution function. The parameters of Weibull had been calculated by author using Graphical method the applied example wind turbine is 5kw wind turbine generator this is suitable turbine for small scale based on wind speed records on the coastal plain of Palestine. This study calculated the energy that can produce from wind turbine to estimate the revenue of any possible project in wind energy conversion system based on unit area. Energy has been calculated wind energy using two different method based on Weibull data and measured data. The total amount of energy for 2010 is 10749.8 kw.hr/m2 based on measured wind speed. Payback period for the project in wind energy turbines is around 3 years which make the generation electricity possible for small scale but not commercial. This study will lead to assess the wind energy production in Palestine to encourage investment in renewable energy sectors. Institute of Advanced Engineering and Science ( IAES ) 2019-12 Article PeerReviewed application/pdf en http://irep.iium.edu.my/74807/1/17347-38598-1-PB_2%20%282%29.pdf application/pdf en http://irep.iium.edu.my/74807/7/74807_Practical%20electrical%20energy%20production%20to%20solve%20the%20shortage%20in%20electricity%20in%20palestine%20and%20pay%20back%20period_Scopus.pdf Badawi, Ahmed S.A. and Hasbullah, Nurul Fadzlin and Yusoff, Siti Hajar and Abdalla Hashim, Aisha Hassan and Elamassie, Mohammed (2019) Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period. International Journal of Electrical and Computer Engineering (IJECE), 9 (6). pp. 4610-4616. ISSN 2088-8708 http://ijece.iaescore.com/index.php/IJECE 10.11591/ijece.v9i6.pp4610-4616
repository_type Digital Repository
institution_category Local University
institution International Islamic University Malaysia
building IIUM Repository
collection Online Access
language English
English
topic TK4001 Applications of electric power
spellingShingle TK4001 Applications of electric power
Badawi, Ahmed S.A.
Hasbullah, Nurul Fadzlin
Yusoff, Siti Hajar
Abdalla Hashim, Aisha Hassan
Elamassie, Mohammed
Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period
description In this paper power energy had been estimated based on actual wind speed records in a coastal city in Palestine Ashdod. The main aims of this study to determine the feasibility of wind turbine and to estimate payback period. Therefore, to encourage investment in renewable energy in Palestine. The daily average wind speed data had been analyzed and fitted to the Weibull probability distribution function. The parameters of Weibull had been calculated by author using Graphical method the applied example wind turbine is 5kw wind turbine generator this is suitable turbine for small scale based on wind speed records on the coastal plain of Palestine. This study calculated the energy that can produce from wind turbine to estimate the revenue of any possible project in wind energy conversion system based on unit area. Energy has been calculated wind energy using two different method based on Weibull data and measured data. The total amount of energy for 2010 is 10749.8 kw.hr/m2 based on measured wind speed. Payback period for the project in wind energy turbines is around 3 years which make the generation electricity possible for small scale but not commercial. This study will lead to assess the wind energy production in Palestine to encourage investment in renewable energy sectors.
format Article
author Badawi, Ahmed S.A.
Hasbullah, Nurul Fadzlin
Yusoff, Siti Hajar
Abdalla Hashim, Aisha Hassan
Elamassie, Mohammed
author_facet Badawi, Ahmed S.A.
Hasbullah, Nurul Fadzlin
Yusoff, Siti Hajar
Abdalla Hashim, Aisha Hassan
Elamassie, Mohammed
author_sort Badawi, Ahmed S.A.
title Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period
title_short Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period
title_full Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period
title_fullStr Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period
title_full_unstemmed Practical electrical energy production to solve the shortage in electricity in Palestine and pay back period
title_sort practical electrical energy production to solve the shortage in electricity in palestine and pay back period
publisher Institute of Advanced Engineering and Science ( IAES )
publishDate 2019
url http://irep.iium.edu.my/74807/
http://irep.iium.edu.my/74807/
http://irep.iium.edu.my/74807/
http://irep.iium.edu.my/74807/1/17347-38598-1-PB_2%20%282%29.pdf
http://irep.iium.edu.my/74807/7/74807_Practical%20electrical%20energy%20production%20to%20solve%20the%20shortage%20in%20electricity%20in%20palestine%20and%20pay%20back%20period_Scopus.pdf
first_indexed 2023-09-18T21:45:52Z
last_indexed 2023-09-18T21:45:52Z
_version_ 1777413445338005504