Conflict management of construction projects – a case study Kuwait International Airport Cargo City

Exchanges within the construction teams have been often found to be argumentative, conflict and crisis ridden, and as a result individual worker in the industry are exposed to extreme hostility. These conflicts result from disagreements about ways of solving spot site-related problems, insufficien...

Full description

Bibliographic Details
Main Authors: Alazemi, Mohammad KhTh E, Mohiuddin, A. K. M., Al-Juboori, Salloom A.
Format: Article
Language:English
English
Published: International Academy of Science, Engineering and Technology (IASET) 2019
Subjects:
Online Access:http://irep.iium.edu.my/73668/
http://irep.iium.edu.my/73668/
http://irep.iium.edu.my/73668/1/73668_Conflict%20management%20of%20construction%20projects.pdf
http://irep.iium.edu.my/73668/7/73668_Conflict%20management%20of%20construction%20projects%20%E2%80%93%20A%20research_Scopus.pdf
id iium-73668
recordtype eprints
spelling iium-736682020-02-06T01:23:07Z http://irep.iium.edu.my/73668/ Conflict management of construction projects – a case study Kuwait International Airport Cargo City Alazemi, Mohammad KhTh E Mohiuddin, A. K. M. Al-Juboori, Salloom A. TA190 Management of engineering works Exchanges within the construction teams have been often found to be argumentative, conflict and crisis ridden, and as a result individual worker in the industry are exposed to extreme hostility. These conflicts result from disagreements about ways of solving spot site-related problems, insufficient planning, ill-prepared contract documents,and the lack of coordination between the contracting parties. Members in a construction project tend to form a community with an intricate set of intertwined relationships. Continuing conflicts among members therefore manifest in further disagreements that can ruin a project, and result in thorny litigation, amplified cost, collapse in communication, and strained task conveyance. This study therefore seeks to discover the causes of such conflicts within the construction sector, and the ways by which these conflicts are resolved. Quantitative design has been used in combination with a cross-sectional questionnaire directed at conflict management of construction projects at the Kuwait international airport. A total of 188 questionnaires have been distributed, out of which 14 were lost, and 11 of them have not been answered. Responses of 163 participants were recorded and analyzed through the use of the Statistical Package for Social Scientists (SPSS). To fix the correspondence issue, the study involved follow-ups of the project status using the digital platform of BIM software in form of progress reports, site reporting, and meeting site project team. Results show that the conflict management strategy of construction project related strongly with employee’s situation, efficiency, law, development, and growth restrictions on investment income at Kuwait project construction sites. The conflict management strategy of construction project was found to have a positive effect on the performance of the workers in construction projects with Beta Coefficient = 0.904;indicating that for one-unit increase in conflict management strategy, the performance of construction projects in Kuwait International Airport Cargo City would increase by 0.904 unit. Finally, when participants were asked if there is a delay in project or not, 63.2% of the total sample answered [Yes] as the highest percent, while 16.6% of the total sample answered by [No] and 20.2% didn't know. International Academy of Science, Engineering and Technology (IASET) 2019-04 Article PeerReviewed application/pdf en http://irep.iium.edu.my/73668/1/73668_Conflict%20management%20of%20construction%20projects.pdf application/pdf en http://irep.iium.edu.my/73668/7/73668_Conflict%20management%20of%20construction%20projects%20%E2%80%93%20A%20research_Scopus.pdf Alazemi, Mohammad KhTh E and Mohiuddin, A. K. M. and Al-Juboori, Salloom A. (2019) Conflict management of construction projects – a case study Kuwait International Airport Cargo City. International Journal of Mechanical Engineering (IJME), 8 (3). pp. 45-54. ISSN 2319-2240 E-ISSN 2319-2259 http://www.iaset.us/archives?jname=67_2&year=2019&submit=Search
repository_type Digital Repository
institution_category Local University
institution International Islamic University Malaysia
building IIUM Repository
collection Online Access
language English
English
topic TA190 Management of engineering works
spellingShingle TA190 Management of engineering works
Alazemi, Mohammad KhTh E
Mohiuddin, A. K. M.
Al-Juboori, Salloom A.
Conflict management of construction projects – a case study Kuwait International Airport Cargo City
description Exchanges within the construction teams have been often found to be argumentative, conflict and crisis ridden, and as a result individual worker in the industry are exposed to extreme hostility. These conflicts result from disagreements about ways of solving spot site-related problems, insufficient planning, ill-prepared contract documents,and the lack of coordination between the contracting parties. Members in a construction project tend to form a community with an intricate set of intertwined relationships. Continuing conflicts among members therefore manifest in further disagreements that can ruin a project, and result in thorny litigation, amplified cost, collapse in communication, and strained task conveyance. This study therefore seeks to discover the causes of such conflicts within the construction sector, and the ways by which these conflicts are resolved. Quantitative design has been used in combination with a cross-sectional questionnaire directed at conflict management of construction projects at the Kuwait international airport. A total of 188 questionnaires have been distributed, out of which 14 were lost, and 11 of them have not been answered. Responses of 163 participants were recorded and analyzed through the use of the Statistical Package for Social Scientists (SPSS). To fix the correspondence issue, the study involved follow-ups of the project status using the digital platform of BIM software in form of progress reports, site reporting, and meeting site project team. Results show that the conflict management strategy of construction project related strongly with employee’s situation, efficiency, law, development, and growth restrictions on investment income at Kuwait project construction sites. The conflict management strategy of construction project was found to have a positive effect on the performance of the workers in construction projects with Beta Coefficient = 0.904;indicating that for one-unit increase in conflict management strategy, the performance of construction projects in Kuwait International Airport Cargo City would increase by 0.904 unit. Finally, when participants were asked if there is a delay in project or not, 63.2% of the total sample answered [Yes] as the highest percent, while 16.6% of the total sample answered by [No] and 20.2% didn't know.
format Article
author Alazemi, Mohammad KhTh E
Mohiuddin, A. K. M.
Al-Juboori, Salloom A.
author_facet Alazemi, Mohammad KhTh E
Mohiuddin, A. K. M.
Al-Juboori, Salloom A.
author_sort Alazemi, Mohammad KhTh E
title Conflict management of construction projects – a case study Kuwait International Airport Cargo City
title_short Conflict management of construction projects – a case study Kuwait International Airport Cargo City
title_full Conflict management of construction projects – a case study Kuwait International Airport Cargo City
title_fullStr Conflict management of construction projects – a case study Kuwait International Airport Cargo City
title_full_unstemmed Conflict management of construction projects – a case study Kuwait International Airport Cargo City
title_sort conflict management of construction projects – a case study kuwait international airport cargo city
publisher International Academy of Science, Engineering and Technology (IASET)
publishDate 2019
url http://irep.iium.edu.my/73668/
http://irep.iium.edu.my/73668/
http://irep.iium.edu.my/73668/1/73668_Conflict%20management%20of%20construction%20projects.pdf
http://irep.iium.edu.my/73668/7/73668_Conflict%20management%20of%20construction%20projects%20%E2%80%93%20A%20research_Scopus.pdf
first_indexed 2023-09-18T21:44:26Z
last_indexed 2023-09-18T21:44:26Z
_version_ 1777413355514888192