Naamandadin, N. A., Sapian, A. R., Mustafa, W. A., Awang, A. H., Abdul Razak, R., & Abdul Rahman, S. A. (2019). Reviewing and identifying the green criteria in relation to the building cost: Project management. Penerbit UTM Press.
Chicago Style (17th ed.) CitationNaamandadin, Nurul Akmam, Abdul Razak Sapian, Wan Azani Mustafa, Arita Hanim Awang, Rajabi Abdul Razak, and Syakir Amir Abdul Rahman. Reviewing and Identifying the Green Criteria in Relation to the Building Cost: Project Management. Penerbit UTM Press, 2019.
MLA (8th ed.) CitationNaamandadin, Nurul Akmam, et al. Reviewing and Identifying the Green Criteria in Relation to the Building Cost: Project Management. Penerbit UTM Press, 2019.
Warning: These citations may not always be 100% accurate.