Implication of incomplete contract (IC) Malaysian private finance initiative (PFI)

Theoretically, contracts are inevitably incomplete. Incomplete contract (IC) is characterized by the absence of clearly defined, in its entirety, ex-ante the parties’ requirements, rights and obligations and there are gaps, missing provisions, and ambiguities in its terms. On the one hand, IC expose...

Full description

Bibliographic Details
Main Authors: Mansor, Nur Syaimasyaza, Abdul Rashid, Khairuddin, Ayob, Mohd Fairullazi, Hasan, Sharina Farihah
Format: Article
Language:English
English
Published: Construction Research Institute of Malaysia (CREAM) 2020
Subjects:
Online Access:http://irep.iium.edu.my/65910/
http://irep.iium.edu.my/65910/
http://irep.iium.edu.my/65910/1/Implication%20Of%20Incomplete%20Contract%20%28IC%29%20In%20Malaysian%20Private%20Finance%20Initiative%20%28PFI%29%20Projects.pdf
http://irep.iium.edu.my/65910/2/MCRJ%20Emails%20-%20Accepted%20for%20Publishing%2020082018.pdf
id iium-65910
recordtype eprints
spelling iium-659102018-09-27T08:11:30Z http://irep.iium.edu.my/65910/ Implication of incomplete contract (IC) Malaysian private finance initiative (PFI) Mansor, Nur Syaimasyaza Abdul Rashid, Khairuddin Ayob, Mohd Fairullazi Hasan, Sharina Farihah K Law (General) TH Building construction TH1000 Systems of building construction TH4021 Buildings. Construction with reference to use. TX955 Building operation and maintenance Theoretically, contracts are inevitably incomplete. Incomplete contract (IC) is characterized by the absence of clearly defined, in its entirety, ex-ante the parties’ requirements, rights and obligations and there are gaps, missing provisions, and ambiguities in its terms. On the one hand, IC exposes the contracting parties to the risk of opportunistic behavior, haggling, and disputes, but on the other hand, it allows flexibility to deal with uncertainty and change. Private Finance Initiative (PFI) contracts in Malaysia also cannot avoid being incomplete and there are twelve (12) clauses that contribute to the incompleteness. Literature review and two-round modified Delphi method were carried out to assess IC’s implication in Malaysian PFI concession contracts. This paper aims to report on the said assessment. The findings showed that the presence of IC in PFI projects in Malaysia causes positive and/or negative implications. Most of the positive implications mentioned on the flexibility of the incomplete clause to deal with future changes and provide the parties opportunity to renegotiate. Meanwhile, many negative implications refer to delay, disputes, and the risk of opportunistic behavior. Input from this paper will facilitate contract designers, and those involved in PFI projects in emphasizing or giving attention to the aspect that contributes to contracting incompleteness and its implications and consequently improves the provisions when drafting new contracts. Construction Research Institute of Malaysia (CREAM) 2020 Article PeerReviewed application/pdf en http://irep.iium.edu.my/65910/1/Implication%20Of%20Incomplete%20Contract%20%28IC%29%20In%20Malaysian%20Private%20Finance%20Initiative%20%28PFI%29%20Projects.pdf application/pdf en http://irep.iium.edu.my/65910/2/MCRJ%20Emails%20-%20Accepted%20for%20Publishing%2020082018.pdf Mansor, Nur Syaimasyaza and Abdul Rashid, Khairuddin and Ayob, Mohd Fairullazi and Hasan, Sharina Farihah (2020) Implication of incomplete contract (IC) Malaysian private finance initiative (PFI). Malaysian Construction Research Journal. ISSN 1985-3807 E-ISSN 2590 - 4140 (In Press) http://www.cream.my/main/index.php
repository_type Digital Repository
institution_category Local University
institution International Islamic University Malaysia
building IIUM Repository
collection Online Access
language English
English
topic K Law (General)
TH Building construction
TH1000 Systems of building construction
TH4021 Buildings. Construction with reference to use.
TX955 Building operation and maintenance
spellingShingle K Law (General)
TH Building construction
TH1000 Systems of building construction
TH4021 Buildings. Construction with reference to use.
TX955 Building operation and maintenance
Mansor, Nur Syaimasyaza
Abdul Rashid, Khairuddin
Ayob, Mohd Fairullazi
Hasan, Sharina Farihah
Implication of incomplete contract (IC) Malaysian private finance initiative (PFI)
description Theoretically, contracts are inevitably incomplete. Incomplete contract (IC) is characterized by the absence of clearly defined, in its entirety, ex-ante the parties’ requirements, rights and obligations and there are gaps, missing provisions, and ambiguities in its terms. On the one hand, IC exposes the contracting parties to the risk of opportunistic behavior, haggling, and disputes, but on the other hand, it allows flexibility to deal with uncertainty and change. Private Finance Initiative (PFI) contracts in Malaysia also cannot avoid being incomplete and there are twelve (12) clauses that contribute to the incompleteness. Literature review and two-round modified Delphi method were carried out to assess IC’s implication in Malaysian PFI concession contracts. This paper aims to report on the said assessment. The findings showed that the presence of IC in PFI projects in Malaysia causes positive and/or negative implications. Most of the positive implications mentioned on the flexibility of the incomplete clause to deal with future changes and provide the parties opportunity to renegotiate. Meanwhile, many negative implications refer to delay, disputes, and the risk of opportunistic behavior. Input from this paper will facilitate contract designers, and those involved in PFI projects in emphasizing or giving attention to the aspect that contributes to contracting incompleteness and its implications and consequently improves the provisions when drafting new contracts.
format Article
author Mansor, Nur Syaimasyaza
Abdul Rashid, Khairuddin
Ayob, Mohd Fairullazi
Hasan, Sharina Farihah
author_facet Mansor, Nur Syaimasyaza
Abdul Rashid, Khairuddin
Ayob, Mohd Fairullazi
Hasan, Sharina Farihah
author_sort Mansor, Nur Syaimasyaza
title Implication of incomplete contract (IC) Malaysian private finance initiative (PFI)
title_short Implication of incomplete contract (IC) Malaysian private finance initiative (PFI)
title_full Implication of incomplete contract (IC) Malaysian private finance initiative (PFI)
title_fullStr Implication of incomplete contract (IC) Malaysian private finance initiative (PFI)
title_full_unstemmed Implication of incomplete contract (IC) Malaysian private finance initiative (PFI)
title_sort implication of incomplete contract (ic) malaysian private finance initiative (pfi)
publisher Construction Research Institute of Malaysia (CREAM)
publishDate 2020
url http://irep.iium.edu.my/65910/
http://irep.iium.edu.my/65910/
http://irep.iium.edu.my/65910/1/Implication%20Of%20Incomplete%20Contract%20%28IC%29%20In%20Malaysian%20Private%20Finance%20Initiative%20%28PFI%29%20Projects.pdf
http://irep.iium.edu.my/65910/2/MCRJ%20Emails%20-%20Accepted%20for%20Publishing%2020082018.pdf
first_indexed 2023-09-18T21:33:31Z
last_indexed 2023-09-18T21:33:31Z
_version_ 1777412668423929856