APA (7th ed.) Citation

Bidi, N. K., Ayob, M. F., & Abdul Rashid, K. (2017). A methodology to investigate the readiness of cost data inputs for the estimation of total cost of a new flexible pavement construction in Malaysia. PIBEC Secretariat D-03A-3, PLAZA PARAGON, POINT 2,JALAN MEDAN PUSAT BANDAR 5, SEKSYEN 9, 43650 BANDAR BARU BANGI, SELANGOR, MALAYSIA.

Chicago Style (17th ed.) Citation

Bidi, Nor Khalisah, Mohd Fairullazi Ayob, and Khairuddin Abdul Rashid. A Methodology to Investigate the Readiness of Cost Data Inputs for the Estimation of Total Cost of a New Flexible Pavement Construction in Malaysia. PIBEC Secretariat D-03A-3, PLAZA PARAGON, POINT 2,JALAN MEDAN PUSAT BANDAR 5, SEKSYEN 9, 43650 BANDAR BARU BANGI, SELANGOR, MALAYSIA, 2017.

MLA (8th ed.) Citation

Bidi, Nor Khalisah, et al. A Methodology to Investigate the Readiness of Cost Data Inputs for the Estimation of Total Cost of a New Flexible Pavement Construction in Malaysia. PIBEC Secretariat D-03A-3, PLAZA PARAGON, POINT 2,JALAN MEDAN PUSAT BANDAR 5, SEKSYEN 9, 43650 BANDAR BARU BANGI, SELANGOR, MALAYSIA, 2017.

Warning: These citations may not always be 100% accurate.