Fuzzy risk analysis for construction projects

The construction industry projects are more subjective and risky compared with the others industries because of the unique characteristics of construction activities such as poor working condition, the significant frequency of accidents and the occupational risky situation. Risk analysis and managem...

Full description

Bibliographic Details
Main Authors: Chaher, Zid, Soomro, Ali Raza
Format: Article
Language:English
Published: 2016
Subjects:
Online Access:http://irep.iium.edu.my/52502/
http://irep.iium.edu.my/52502/
http://irep.iium.edu.my/52502/
http://irep.iium.edu.my/52502/1/WASJ%20Fuzzy%20Risk%20Analysis.pdf
id iium-52502
recordtype eprints
spelling iium-525022016-11-03T07:57:26Z http://irep.iium.edu.my/52502/ Fuzzy risk analysis for construction projects Chaher, Zid Soomro, Ali Raza TA Engineering (General). Civil engineering (General) TA190 Management of engineering works TH Building construction The construction industry projects are more subjective and risky compared with the others industries because of the unique characteristics of construction activities such as poor working condition, the significant frequency of accidents and the occupational risky situation. Risk analysis and management on the project sites is the first key to achieve adequate level of security. However, the modern construction and the new sophisticated design have shown a significant obstacles and uncertainties to complete the project safely; thereby it is inevitable to search a new approach to deal with uncertainties. The ability of a fuzzy system to deliver its reasoning process is presented to have absolute result within the field of risk analysis. As well as, fuzzy set theory is mainly subjective and associated to deal with inexact and vague information in construction projects. This paper describes the stages of the fuzzy risk analysis model which is developed to assess the risks related with construction projects and their uncertainties based on evaluations of cost, time and quality. Ultimately, using this model we can prioritize and rank all risk factors cited in the construction project; besides that we can easily manage them in the best appropriate way. 2016 Article PeerReviewed application/pdf en http://irep.iium.edu.my/52502/1/WASJ%20Fuzzy%20Risk%20Analysis.pdf Chaher, Zid and Soomro, Ali Raza (2016) Fuzzy risk analysis for construction projects. World Applied Sciences Journal, 34 (8). pp. 1010-1020. ISSN 1818-4952 http://www.idosi.org/wasj/wasj34(8)16/4.pdf 10.5829/idosi.wasj.2016.34.8.70
repository_type Digital Repository
institution_category Local University
institution International Islamic University Malaysia
building IIUM Repository
collection Online Access
language English
topic TA Engineering (General). Civil engineering (General)
TA190 Management of engineering works
TH Building construction
spellingShingle TA Engineering (General). Civil engineering (General)
TA190 Management of engineering works
TH Building construction
Chaher, Zid
Soomro, Ali Raza
Fuzzy risk analysis for construction projects
description The construction industry projects are more subjective and risky compared with the others industries because of the unique characteristics of construction activities such as poor working condition, the significant frequency of accidents and the occupational risky situation. Risk analysis and management on the project sites is the first key to achieve adequate level of security. However, the modern construction and the new sophisticated design have shown a significant obstacles and uncertainties to complete the project safely; thereby it is inevitable to search a new approach to deal with uncertainties. The ability of a fuzzy system to deliver its reasoning process is presented to have absolute result within the field of risk analysis. As well as, fuzzy set theory is mainly subjective and associated to deal with inexact and vague information in construction projects. This paper describes the stages of the fuzzy risk analysis model which is developed to assess the risks related with construction projects and their uncertainties based on evaluations of cost, time and quality. Ultimately, using this model we can prioritize and rank all risk factors cited in the construction project; besides that we can easily manage them in the best appropriate way.
format Article
author Chaher, Zid
Soomro, Ali Raza
author_facet Chaher, Zid
Soomro, Ali Raza
author_sort Chaher, Zid
title Fuzzy risk analysis for construction projects
title_short Fuzzy risk analysis for construction projects
title_full Fuzzy risk analysis for construction projects
title_fullStr Fuzzy risk analysis for construction projects
title_full_unstemmed Fuzzy risk analysis for construction projects
title_sort fuzzy risk analysis for construction projects
publishDate 2016
url http://irep.iium.edu.my/52502/
http://irep.iium.edu.my/52502/
http://irep.iium.edu.my/52502/
http://irep.iium.edu.my/52502/1/WASJ%20Fuzzy%20Risk%20Analysis.pdf
first_indexed 2023-09-18T21:14:23Z
last_indexed 2023-09-18T21:14:23Z
_version_ 1777411464378712064