Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique
This paper proposes a conceptual framework for owner- contractor relationship and time–cost trade-off analysis of construction project control system using fuzzy logic approach. Construction projects require a well-defined starting point and well-defined finish point with accurate resource allocat...
Main Authors: | Al Hazza, Muataz Hazza Faizi, Adesta, Erry Yulian Triblas, Al Fadel, Mohammad |
---|---|
Format: | Conference or Workshop Item |
Language: | English English |
Published: |
Institute of Electrical and Electronics Engineers Inc.
2015
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/42771/ http://irep.iium.edu.my/42771/ http://irep.iium.edu.my/42771/ http://irep.iium.edu.my/42771/1/42771.pdf http://irep.iium.edu.my/42771/4/42771_Modeling%20a%20conceptual%20framework.SCOPUS.pdf |
Similar Items
-
The development of cost structuring of high speed hard turning
by: Al Hazza, Muataz Hazza Faizi, et al.
Published: (2009) -
New approach in cost structuring of high speed hard turning
by: Al Hazza, Muataz Hazza Faizi, et al.
Published: (2011) -
Development of tooling cost model in high speed hard turning
by: Al Hazza, Muataz Hazza Faizi, et al.
Published: (2011) -
The Development of Cost Structure for High Speed Hard Turning
by: Adesta, Erry Yulian Triblas, et al.
Published: (2008) -
Tool life in high speed turning with negative rake angle
by: Adesta, Erry Yulian Triblas, et al.
Published: (2011)