Investigating the reliability and validity of data inputs for building life cycle cost (LCC)
Commentators advocate that most practitioners focus only on conversion but very seldom they consider the reliability and credibility of data inputs of Life Cycle Cost (LCC). The research identified two developed LCC conversion softwares in the Malaysian construction industry: LICCOMS and LCCsoft how...
Main Authors: | Ayob, Mohd Fairullazi, Abdul Rashid, Khairuddin |
---|---|
Format: | Conference or Workshop Item |
Language: | English English English |
Published: |
2011
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/37728/ http://irep.iium.edu.my/37728/1/International_JV_28_September_2011.pdf http://irep.iium.edu.my/37728/4/CertificateJVConf.IMG.pdf http://irep.iium.edu.my/37728/7/JV_LETTER_OF_INVITATION-03.pdf |
Similar Items
-
Investigation on reliability and validity of Life Cycle Cost (LCC) data inputs of building
by: Ayob, Mohd Fairullazi, et al.
Published: (2016) -
Proposing a methodology to investigate the reliability and validity of data inputs for building (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011) -
Investigation of quality of cost data input in Life Cycle Cost (LCC) analysis in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016) -
Investigation on quality of cost data input in Life Cycle Cost (LCC) analysis in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016) -
Identification of cost data input in life cycle cost (LCC) for building projects
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)