Issues on data availability, accessibility, currency and its reliability as inputs in the LCC studies in Malaysia
Commentators often pointed out the main focus of the local practitioners and scholars on LCC in the Malaysian construction industry is considerably on the LCC conversion which includes the methodology and models of computing LCC, but very little emphasis is given on the availability, accessibility,...
Main Authors: | Ayob, Mohd Fairullazi, Abdul Rashid, Khairuddin |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/37713/ http://irep.iium.edu.my/37713/ http://irep.iium.edu.my/37713/1/MiCRA_5th_December_2012.pdf |
Similar Items
-
Proposing a methodology to investigate the reliability and validity of data inputs for building (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011) -
Investigating the reliability and validity of data inputs for building life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011) -
Investigation on reliability and validity of Life Cycle Cost (LCC) data inputs of building
by: Ayob, Mohd Fairullazi, et al.
Published: (2016) -
Protocol of Life Cycle Cost (LCC) data input requirements process
by: Ayob, Mohd Fairullazi, et al.
Published: (2016) -
Protocol of Life Cycle Cost (LCC) data input requirements process
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)