Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project

The increased stiffness in competition has dramatically increased the risk occurrence in project delivery. As the number of projects grows, enterprises or project managers have to eventually run simultaneous projects. Risk management in such cases becomes extremely necessary as failure of one projec...

Full description

Bibliographic Details
Main Authors: Ibrahim, Jamaludin, Wani, Sharyar, Elsadig Adam, Mutasim, Abdullahi, Husein Osman, Shamsudin, Ahmad Faizul
Format: Conference or Workshop Item
Language:English
English
Published: 2013
Subjects:
Online Access:http://irep.iium.edu.my/30846/
http://irep.iium.edu.my/30846/
http://irep.iium.edu.my/30846/1/Table_of_Content.pdf
http://irep.iium.edu.my/30846/2/108.pdf
id iium-30846
recordtype eprints
spelling iium-308462013-08-14T20:48:04Z http://irep.iium.edu.my/30846/ Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project Ibrahim, Jamaludin Wani, Sharyar Elsadig Adam, Mutasim Abdullahi, Husein Osman Shamsudin, Ahmad Faizul HD61 Risk Management T58.5 Information technology T58.6 Management information systems The increased stiffness in competition has dramatically increased the risk occurrence in project delivery. As the number of projects grows, enterprises or project managers have to eventually run simultaneous projects. Risk management in such cases becomes extremely necessary as failure of one project may lead to the near failure of all the parallel projects running under the same supervision. Therefore, it becomes necessary to understand the best practices for risk management in a parallel project operation environment. Though the issue is of high importance, yet not much has been discussed. This study was carried out in an enterprise environment whereby professionals of this field with high experience were interviewed and requested to share their experiences. The research results bear witness to the fact that risk is inevitable and leaves a strong negative impact on all the projects operating in parallel. As such there is a high need to understand the strategies and best practices that are being applied in this field to avoid heavy losses. We seek to apply lessons learned to managing the DBrain research project which has multiple collaborators working in parallel. 2013 Conference or Workshop Item PeerReviewed application/pdf en http://irep.iium.edu.my/30846/1/Table_of_Content.pdf application/pdf en http://irep.iium.edu.my/30846/2/108.pdf Ibrahim, Jamaludin and Wani, Sharyar and Elsadig Adam, Mutasim and Abdullahi, Husein Osman and Shamsudin, Ahmad Faizul (2013) Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project. In: The 4th International Conference on Information & Communication Technology for the Muslim World (ICT4M), 25-27 Mar 2013, Rabat, Moroco. http://ict4m.org/
repository_type Digital Repository
institution_category Local University
institution International Islamic University Malaysia
building IIUM Repository
collection Online Access
language English
English
topic HD61 Risk Management
T58.5 Information technology
T58.6 Management information systems
spellingShingle HD61 Risk Management
T58.5 Information technology
T58.6 Management information systems
Ibrahim, Jamaludin
Wani, Sharyar
Elsadig Adam, Mutasim
Abdullahi, Husein Osman
Shamsudin, Ahmad Faizul
Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project
description The increased stiffness in competition has dramatically increased the risk occurrence in project delivery. As the number of projects grows, enterprises or project managers have to eventually run simultaneous projects. Risk management in such cases becomes extremely necessary as failure of one project may lead to the near failure of all the parallel projects running under the same supervision. Therefore, it becomes necessary to understand the best practices for risk management in a parallel project operation environment. Though the issue is of high importance, yet not much has been discussed. This study was carried out in an enterprise environment whereby professionals of this field with high experience were interviewed and requested to share their experiences. The research results bear witness to the fact that risk is inevitable and leaves a strong negative impact on all the projects operating in parallel. As such there is a high need to understand the strategies and best practices that are being applied in this field to avoid heavy losses. We seek to apply lessons learned to managing the DBrain research project which has multiple collaborators working in parallel.
format Conference or Workshop Item
author Ibrahim, Jamaludin
Wani, Sharyar
Elsadig Adam, Mutasim
Abdullahi, Husein Osman
Shamsudin, Ahmad Faizul
author_facet Ibrahim, Jamaludin
Wani, Sharyar
Elsadig Adam, Mutasim
Abdullahi, Husein Osman
Shamsudin, Ahmad Faizul
author_sort Ibrahim, Jamaludin
title Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project
title_short Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project
title_full Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project
title_fullStr Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project
title_full_unstemmed Risk Management in Parallel Projects: Analysis & Best Practices and Implications to Generic DBrain (gDBrain) Research Project
title_sort risk management in parallel projects: analysis & best practices and implications to generic dbrain (gdbrain) research project
publishDate 2013
url http://irep.iium.edu.my/30846/
http://irep.iium.edu.my/30846/
http://irep.iium.edu.my/30846/1/Table_of_Content.pdf
http://irep.iium.edu.my/30846/2/108.pdf
first_indexed 2023-09-18T20:45:06Z
last_indexed 2023-09-18T20:45:06Z
_version_ 1777409622060040192