Malaysian labour productivity for reinforced concrete structural frame: a case study
Abstract Labour productivity is one of the major tools in preparing an effective work program.As there is no principle on labour productivity being practiced in Malaysia for the preparation of work program, most of the construction planners are adopting the labour productivity data from other countr...
Main Authors: | Ali, Maisarah, Abdul Hamid, Haslina, Idris , Mohd Zaifuddin |
---|---|
Format: | Conference or Workshop Item |
Language: | English English English English |
Published: |
2012
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/28390/ http://irep.iium.edu.my/28390/1/Labour_productivity_maisarahCOSTAM.pdf http://irep.iium.edu.my/28390/4/Costam2.jpg http://irep.iium.edu.my/28390/5/Costam.jpg http://irep.iium.edu.my/28390/12/Maisarah_Ali.pdf |
Similar Items
-
Current status of life cycle cost practice in Malaysian construction industry
by: Ayob, Mohd Fairullazi, et al.
Published: (2016) -
Framework for a standard form of joint venture agreement for construction works
by: Abdul Rashid, Khairuddin, et al.
Published: (2010) -
Busines development opportunities through pursuit of joint-venture initiatives in construction
by: Preece, Christopher Nigel, et al.
Published: (2010) -
Bills of quantities: raison d’etre?
by: Bandi, Shamsul Hadi
Published: (2011) -
Conceptualizing issues relating to the bills of quantities
by: Bandi, Shamsul Hadi, et al.
Published: (2012)