Malaysian labour productivity for reinforced concrete structural frame: a case study
Abstract Labour productivity is one of the major tools in preparing an effective work program.As there is no principle on labour productivity being practiced in Malaysia for the preparation of work program, most of the construction planners are adopting the labour productivity data from other countr...
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Language: | English English English English |
Published: |
2012
|
Subjects: | |
Online Access: | http://irep.iium.edu.my/28390/ http://irep.iium.edu.my/28390/1/Labour_productivity_maisarahCOSTAM.pdf http://irep.iium.edu.my/28390/4/Costam2.jpg http://irep.iium.edu.my/28390/5/Costam.jpg http://irep.iium.edu.my/28390/12/Maisarah_Ali.pdf |
id |
iium-28390 |
---|---|
recordtype |
eprints |
spelling |
iium-283902013-10-03T07:58:35Z http://irep.iium.edu.my/28390/ Malaysian labour productivity for reinforced concrete structural frame: a case study Ali, Maisarah Abdul Hamid, Haslina Idris , Mohd Zaifuddin TH4021 Buildings. Construction with reference to use. Abstract Labour productivity is one of the major tools in preparing an effective work program.As there is no principle on labour productivity being practiced in Malaysia for the preparation of work program, most of the construction planners are adopting the labour productivity data from other countries such as United Kingdom, United States. These labour productivity rates are unsuitable for Malaysian condition and frequently caused over-run in time and cost.The aim of the study is to come up with Malaysian labour productivity for reinforced concrete structural frame. Data were collected from two construction sites through observation and time study method. From the data calculations on labour productivity for reinforced concrete structural works were obtained. The study also came up with productivity equations which were derived from regression analysis.It is recommended that a more extensive data collection to be carried out in future studies to improve the accuracy of the data and the precision of the equations. Keywords Labour productivity, reinforced concrete structure, regression analysis, work program, construction planners 2012-11-19 Conference or Workshop Item PeerReviewed application/pdf en http://irep.iium.edu.my/28390/1/Labour_productivity_maisarahCOSTAM.pdf application/pdf en http://irep.iium.edu.my/28390/4/Costam2.jpg application/pdf en http://irep.iium.edu.my/28390/5/Costam.jpg application/pdf en http://irep.iium.edu.my/28390/12/Maisarah_Ali.pdf Ali, Maisarah and Abdul Hamid, Haslina and Idris , Mohd Zaifuddin (2012) Malaysian labour productivity for reinforced concrete structural frame: a case study. In: Malaysian Science Technology Congress, 19-21 Nov 2012, Sime Darby Convention Centre. (Unpublished) |
repository_type |
Digital Repository |
institution_category |
Local University |
institution |
International Islamic University Malaysia |
building |
IIUM Repository |
collection |
Online Access |
language |
English English English English |
topic |
TH4021 Buildings. Construction with reference to use. |
spellingShingle |
TH4021 Buildings. Construction with reference to use. Ali, Maisarah Abdul Hamid, Haslina Idris , Mohd Zaifuddin Malaysian labour productivity for reinforced concrete structural frame: a case study |
description |
Abstract Labour productivity is one of the major tools in preparing an effective work program.As there is no principle on labour productivity being practiced in Malaysia for the preparation of work program, most of the construction planners are adopting the labour productivity data from other countries such as United Kingdom, United States. These labour productivity rates are unsuitable for Malaysian condition and frequently caused over-run in time and cost.The aim of the study is to come up with Malaysian labour productivity for reinforced concrete structural frame. Data were collected from two construction sites through observation and time study method. From the data calculations on labour productivity for reinforced concrete structural works were obtained. The study also came up with productivity equations which were derived from regression analysis.It is recommended that a more extensive data collection to be carried out in future studies to improve the accuracy of the data and the precision of the equations.
Keywords Labour productivity, reinforced concrete structure, regression analysis, work program, construction planners |
format |
Conference or Workshop Item |
author |
Ali, Maisarah Abdul Hamid, Haslina Idris , Mohd Zaifuddin |
author_facet |
Ali, Maisarah Abdul Hamid, Haslina Idris , Mohd Zaifuddin |
author_sort |
Ali, Maisarah |
title |
Malaysian labour productivity for reinforced concrete structural frame: a case study |
title_short |
Malaysian labour productivity for reinforced concrete structural frame: a case study |
title_full |
Malaysian labour productivity for reinforced concrete structural frame: a case study |
title_fullStr |
Malaysian labour productivity for reinforced concrete structural frame: a case study |
title_full_unstemmed |
Malaysian labour productivity for reinforced concrete structural frame: a case study |
title_sort |
malaysian labour productivity for reinforced concrete structural frame: a case study |
publishDate |
2012 |
url |
http://irep.iium.edu.my/28390/ http://irep.iium.edu.my/28390/1/Labour_productivity_maisarahCOSTAM.pdf http://irep.iium.edu.my/28390/4/Costam2.jpg http://irep.iium.edu.my/28390/5/Costam.jpg http://irep.iium.edu.my/28390/12/Maisarah_Ali.pdf |
first_indexed |
2023-09-18T20:41:53Z |
last_indexed |
2023-09-18T20:41:53Z |
_version_ |
1777409420049776640 |